BD+C April 2013

More content from BD+C April 2013

Jared Krieger (right) Conducts A Project Coordination Meeting With Two Of His Gensler Colleagues At The Firms Washington, Dc , Office Such Meetings Are Often Held Online, With Multiple Members Of The Building Team Collaborating On Design And Construction Issues Using The Bim Model

'My BIM journey' – 6 lessons from a BIM/VDC expert

Like most heavy-duty BIM users, I experienced that “Eureka!” moment when I became a true believer in the power of this new technology. My epiphany came several years ago, during...
April 5, 2013
Duke1 0

6 lobby design tips

Editor's note: This article was published as part of our March 2013 report on hospital lobby design stategies.   If you do hotels, schools, student unions, office buildings...
April 2, 2013
This Five Story Atrium Links All Clinical Areas At The Duke Cancer Center, Drawing The Eye To A Custom Wood Screen The Design Was Inspired By The Campuss Collegiate Gothic Tradition, As Well As The Regions Native Loblolly Pines

4 hospital lobbies provide a healthy perspective

Personalized medicine is a watchword in modern healthcare. Hospital systems are under enormous pressure to achieve better clinical outcomes. They are responding in part by developing...
April 2, 2013
Due To Open In August 2013, The West Branch Library In Berkeley, Calif, Replaces A Branch Library Building Formerly Located On The Site Its Net Zero Energy And Carbon Neutral Design Scheme Was Crucial To Getting The $5 5 Million, 9,500 Sf Replacement Project Approved By The City Board

Small but mighty: Berkeley public library’s net-zero gem

Situated on a tiny, quarter-acre lot along bustling University Avenue, Berkeley, Calif.’s, new West Branch library may not be large in stature, but it’s one of the most significant...
March 27, 2013