flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Los Angeles launches fast-track office tenant improvements program

Codes and Standards

Los Angeles launches fast-track office tenant improvements program

Red tape to be cut to make interiors healthier and safer.


By Peter Fabris, Contributing Editor | November 10, 2021
Los Angeles skyline

Courtesy Pixabay

The Los Angeles Department of Building and Safety recently launched the Fast-Track Office Tenant Improvements Program.

The effort is a response to the COVID-19 pandemic and the resulting market demand “to reconfigure, retrofit, and/or reprogram existing workplaces, retail sites, and commercial office buildings for healthy, safer, and more equitable interior spaces,” according to a news release. The department offers its E-Plan portal to help fast-track the permitting and approval process for tenant improvement projects.

The department developed the plan after gathering input from local architects and building owners and managers. “This program serves residents, visitors, and those whose livelihoods depend on safe and rapid re-opening of commercial spaces,” said Wade Killefer, FAIA, president, AIA Los Angeles. “Fast-tracking these improvements means important and necessary adjustments can be benefited from more rapidly.”

The program is available to all licensed architects and engineers who wish to participate. Projects are limited in scope to basic tenant improvements or office fit-outs only.

Related Stories

| Sep 1, 2011

Project Aims to Automate Code Compliance Assessment

FIATECH, a consortium of owners from the industrial, power, and retail markets that build large structures, launched a project this year to validate the use of automation technology for code compliance assessment, and to accelerate the regulatory approval process using building models. Long-term objectives include the development of an extensive, open-source rule set library that is approved by industry and regulatory bodies for use by technology developers and code officials.

| Sep 1, 2011

EPA Says Additional Lead Paint Cleaning Rules Not Necessary

The EPA has concluded that current Lead: Renovation, Repair, and Painting Program (LRRP) cleaning requirements and lead-safe work regulations are sufficient to protect the public from lead dust hazards. “Our members have been instrumental in contacting legislators to detail the detrimental impact of the current LRRP," says Richard Walker, American Architectural Manufacturers Association’s president and CEO. “This collective industry voice has prompted the EPA to make the responsible decision to refrain from adding further, unnecessary costs to homeowners under the current economic climate."http://www.aamanet.org/news/1/10/0/all/603/aama-commends-its-members-congress-for-vacating-lrrp-clearance-rule

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021