flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Los Angeles launches fast-track office tenant improvements program

Codes and Standards

Los Angeles launches fast-track office tenant improvements program

Red tape to be cut to make interiors healthier and safer.


By Peter Fabris, Contributing Editor | November 10, 2021
Los Angeles skyline

Courtesy Pixabay

The Los Angeles Department of Building and Safety recently launched the Fast-Track Office Tenant Improvements Program.

The effort is a response to the COVID-19 pandemic and the resulting market demand “to reconfigure, retrofit, and/or reprogram existing workplaces, retail sites, and commercial office buildings for healthy, safer, and more equitable interior spaces,” according to a news release. The department offers its E-Plan portal to help fast-track the permitting and approval process for tenant improvement projects.

The department developed the plan after gathering input from local architects and building owners and managers. “This program serves residents, visitors, and those whose livelihoods depend on safe and rapid re-opening of commercial spaces,” said Wade Killefer, FAIA, president, AIA Los Angeles. “Fast-tracking these improvements means important and necessary adjustments can be benefited from more rapidly.”

The program is available to all licensed architects and engineers who wish to participate. Projects are limited in scope to basic tenant improvements or office fit-outs only.

Related Stories

| Feb 23, 2012

New Virginia statewide building code goes into effect March 1

After March 1, all building plans in Virginia must adhere to the 2009 code that was adopted a year ago.

| Feb 23, 2012

Privatizing flood insurance could lead to new code requirements

One thing that could pave the way toward private flood insurance would be NFIP reforms, like requiring new construction in flood-prone areas to be elevated.

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

| Feb 20, 2012

Comment period for update to USGBC's LEED Green Building Program now open

This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.

| Feb 20, 2012

GAF introduces web portal for architects and specifiers

The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.

| Feb 17, 2012

AGC advocates for federal procurement reform

Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.

| Feb 17, 2012

Codes not to blame for Anchorage roof collapses following heavy snows

Design or construction problems likely contributed to the collapses, according to city officials.

| Feb 17, 2012

Comment period opens March 1 for LEED 2012 update

USGBC says that LEED's strength comes from its continuous evolution.

| Feb 17, 2012

OSHA training videos on proper respirator use available online

17 short videos to help workers learn about the proper use of respirators on the job.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021