flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Los Angeles launches fast-track office tenant improvements program

Codes and Standards

Los Angeles launches fast-track office tenant improvements program

Red tape to be cut to make interiors healthier and safer.


By Peter Fabris, Contributing Editor | November 10, 2021
Los Angeles skyline

Courtesy Pixabay

The Los Angeles Department of Building and Safety recently launched the Fast-Track Office Tenant Improvements Program.

The effort is a response to the COVID-19 pandemic and the resulting market demand “to reconfigure, retrofit, and/or reprogram existing workplaces, retail sites, and commercial office buildings for healthy, safer, and more equitable interior spaces,” according to a news release. The department offers its E-Plan portal to help fast-track the permitting and approval process for tenant improvement projects.

The department developed the plan after gathering input from local architects and building owners and managers. “This program serves residents, visitors, and those whose livelihoods depend on safe and rapid re-opening of commercial spaces,” said Wade Killefer, FAIA, president, AIA Los Angeles. “Fast-tracking these improvements means important and necessary adjustments can be benefited from more rapidly.”

The program is available to all licensed architects and engineers who wish to participate. Projects are limited in scope to basic tenant improvements or office fit-outs only.

Related Stories

| Dec 15, 2011

Building to LEED standards can pose new risks for construction workers

Workers on these projects suffer a 24% increase in falls to lower levels during roof work, which researchers attributed to the installation of solar panels, and a few other risks.

| Dec 15, 2011

NRDC charges Maine governor with weakening green wood requirement

The FSC program is administered through the Leadership in Energy and Environmental Design (LEED) and requires wood to be harvested in a sustainable way.

| Dec 15, 2011

Post-tornado, Tuscaloosa seeks to create walkable urban, retail areas

Block sizes initially were limited to a maximum perimeter of 1,750 feet, with no side of the block being longer than 500 feet.

| Dec 15, 2011

Allentown, Pa. city council asked to repeal union-friendly law

The mayor of Allentown, Pa. asked the City Council to repeal a year-old ordinance that forces contractors to hire union workers for large city projects funded with state and federal dollars.

| Dec 13, 2011

LEED-EB outpaces LEED for new construction

The U.S. Green Building Council's (USGBC's) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 13, 2011

Regulators charge pervasive abuse of construction workers in Connecticut

Federal and state regulators say they have uncovered what they call "widespread noncompliance" with minimum wage and overtime laws in Connecticut's construction industry.

| Dec 13, 2011

Philadelphia mayor signs order for project labor agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

| Dec 13, 2011

Improved code requirements for attic ventilation

The Roof Assembly Ventilation Coalition (RAVC) participated in the development of the code.

| Dec 12, 2011

LEED-EB Outpaces LEED for New Construction

The U.S. Green Building Council’s (USGBC’s) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 12, 2011

Philadelphia Mayor Signs Order for Project Labor Agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

boombox1
boombox2
native1

More In Category

Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021