flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Harvard’s District Energy Facility showcases a new infrastructure typology

University Buildings

Harvard’s District Energy Facility showcases a new infrastructure typology

The building is currently under construction.


By David Malone, Associate Editor | March 14, 2018
The DEF at night

Rendering courtesy of Leers Weinzapfel Associates

The 58,000-sf Harvard University Allston Campus District Energy Facility (DEF) will provide electricity, hot water, and chilled water to the Allston campus. The building represents a new infrastructure typology dubbed the cogeneration plant.

Designed by Leers Weinzapfel Associates, the DEF uses a compact cubic form with rounded corners that allows for maximum flexibility of future development and is a visible demonstration of cost-effective sustainability in building. The facility is wrapped in metal fins that form a screen around it, with “petal-like” elements set at varying degrees of openness to reveal or conceal the various equipment areas within.

 

Harvard's DEF as seen from across the riverRendering courtesy of Leers Weinzapfel Associates.

 

The fins are most open at the building’s corner entry and round the thermal energy storage tank. They are most closed on the service sides. The fins are raised above the ground on the public face of the building to reveal the main equipment hall to passersby.

The DEF’s transparent interior allows it to be used as a teaching tool for the university’s new science and engineering campus. People can observe the cogeneration plant’s complicated system of chillers, boilers, piping, pumps and flues, and electrical tools.

 

Rendering of Harvard's DEFRendering courtesy of Leers Weinzapfel Associates.

 

RMF Engineering designed the DEF’s equipment systems, which are efficient, resilient, and adaptable to the campus’s future needs. A chilled water reserve tank provides thermal energy to support efficient equipment use and equipment elevated above flood levels supports resiliency for continuous independent operation of the facility, even in the event of electrical grid failure. 

The project is slated for completion in 2019.

 

Rendering courtesy of Leers Weinzapfel Associates.

Tags

Related Stories

University Buildings | Aug 22, 2018

Skanska completes James Madison University’s new dining hall

The three-story building will open for fall semester 2018.

University Buildings | Aug 14, 2018

Following in the Ryan Fieldhouse’s footsteps, Northwestern University’s Walter Athletics Center officially opens

Perkins+Will designed both the Ryan Fieldhouse and the new Walter Athletics Center.

University Buildings | Aug 6, 2018

Academic honors: The importance of residence halls

Three recent projects demonstrate the dynamic role residence halls are playing on America’s college and university campuses.

University Buildings | Jul 30, 2018

University trends 2018: Schools are desperately searching for ways to economize

Though the U.S. economy is strong with investment gains buoying endowments, colleges and universities face pressures to economize and stretch their capital budgets.

Multifamily Housing | Jul 13, 2018

Student housing vs. multifamily housing—what are the differences?

While student and multi-family housing share a common building form, it’s the student resident that drives the innovation of new spaces.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

University Buildings | Jun 25, 2018

Virginia Commonwealth has at least three major expansion projects under construction

New buildings for outpatient care, engineering, and rehabilitation of serious injuries and debilities are scheduled to be completed in 2020.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021