flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Google to convert an Alabama coal-burning plant to a data center running on clean energy

Industrial Facilities

Google to convert an Alabama coal-burning plant to a data center running on clean energy

This would be the tech giant’s seventh data center in the U.S.


By John Caulfield, Senior Editor | June 26, 2015
Google to convert an Alabama coal-burning plant to a data center running on clean energy

This October, Tennessee Valley Authority will close its outdated Widows Creek coal plant in Stevenson, Ala., which had been providing energy to the region since the 1960s. Photo: TVA Web Team via Wikimedia Commons

The coal-producing industry has taken its lumps of late, a victim of natural gas fracking and restrictions on air pollution. This October, Tennessee Valley Authority (TVA) will finally close its outdated Widows Creek coal plant in Stevenson, Ala., which had been providing energy to the region since the 1960s, rather than knock heads with the EPA over tighter financial and environmental regulations.

That plant, located on 350 acres about 60 miles northeast of Huntsville, will be retrofitted into a data center that runs on renewable energy. Google has agreed to build this $600 million project, which would be its 14th data center globally, but the first it has committed to in eight years, according to the San Antonio Express-News.

Google’s data centers in Iowa and Oklahoma run on wind power, and the Alabama facility will operate solely on renewable energy, possibly a combination of wind and solar.

The company states on its website that it has recently expanded its data centers in the states of Georgia and Iowa, as well as in Singapore and Belgium. Construction on the Alabama plant is scheduled to begin early next year and to bring between 75 and 100 jobs to Jackson County.

Google’s data centers in Iowa and Oklahoma run on wind power, and the Alabama facility will operate solely on renewable energy, possibly a combination of wind and solar, the company states. The data center will be hooked up to TVA’s electrical transmission lines, and Google will work with the Authority to run renewable energy through the latter’s electrical grid.

Alabama Gov. Robert Bentley called this project “the start of a long-lasting, productive relationship with Google.” He credited the TVA’s chairman Joe Ritch for securing the project. Google will benefit from two state tax-abatement packages that stem from the passage, three years ago, of the Alabama Data Processing Center Incentive Enhancement Act, according to AL.com.

Gary Demasi, Google’s director of Global Infrastructure, said in a prepared statement that Google sees “a lot of potential in redeveloping large industrial sites like former coal plants, and we’re excited to bring a data center to Alabama.” Urs Hölzle, Google’s SVP for technical infrastructure, told the New York Times that the company would be evaluating “plausible projects” over the next 12 months.

The data center is expected to incorporate Google’s latest technology efficiencies, which allow it to get 3.5 times the computing power out of the same amount of energy, compared to five years ago.

Related Stories

Sponsored | | Jul 17, 2014

A major hop forward

The construction of efficient metal buildings has helped Perrault Farms expand its hops-harvesting business.

| Jul 14, 2014

Foster + Partners unveils triple-glazed tower for RMK headquarters

The London-based firm unveiled plans for the Russian Copper Company's headquarters in Yekaterinburg.

| Jul 10, 2014

Berkeley Lab opens 'world's most comprehensive building efficiency simulator'

  DOE’s new FLEXLAB is a first-of-its-kind simulator that lets users test energy-efficient building systems individually or as an integrated system, under real-world conditions.

| Jul 7, 2014

7 emerging design trends in brick buildings

From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick. 

| Jul 2, 2014

Emerging trends in commercial flooring

Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.

| Jun 30, 2014

Report recommends making infrastructure upgrades a cabinet-level priority

The ASCE estimates that $3.6 trillion must be invested by 2020 to make critically needed upgrades and expansions of national infrastructure—and avoid trillions of dollars in lost business sales, exports, disposable income, and GDP. 

Sponsored | | Jun 27, 2014

SAFTI FIRST Now Offers GPX Framing with Sunshade Connectors

For the Doolittle Maintenance Facility, SAFTI FIRST provided 60 minute, fire resistive wall openings in the exterior using SuperLite II-XL 60 insulated with low-e glazing in GPX Framing with a clear anodized finish. 

| Jun 18, 2014

Arup uses 3D printing to fabricate one-of-a-kind structural steel components

The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.

| Jun 16, 2014

6 U.S. cities at the forefront of innovation districts

A new Brookings Institution study records the emergence of “competitive places that are also cool spaces.”

| Jun 12, 2014

Austrian university develops 'inflatable' concrete dome method

Constructing a concrete dome is a costly process, but this may change soon. A team from the Vienna University of Technology has developed a method that allows concrete domes to form with the use of air and steel cables instead of expensive, timber supporting structures.

boombox1
boombox2
native1

More In Category

Industrial Facilities

8 ways to cool a factory

Whichever way you look at it—from a workplace wellness point of view or from a competing for talent angle—there are good reasons to explore options for climate control in the factory workplace.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021