flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fresh off NCAA national title, Clemson opens plush football operations complex

University Buildings

Fresh off NCAA national title, Clemson opens plush football operations complex

The 142,500-sf facility, which opened just three weeks after Clemson’s national championship win over the University of Alabama, adjoins the indoor practice facility and outdoor practice fields, consolidating football operations into one complex.


By BD+C Staff | March 14, 2017

Courtesy HOK

Two-lane bowling alley, wiffle ball field, nine-hole mini-golf course, 24-seat HD movie theater, indoor slide, VR studio. Clemson University has certainly upped the ante when it comes to elite Division I football recruiting with its newly christened $55 million Football Operations Complex. The 142,500-sf facility, which opened just three weeks after Clemson’s national championship win over the University of Alabama, adjoins the indoor practice facility and outdoor practice fields, consolidating football operations into one complex. It is the largest football-specific facility in the U.S.

Designed by HOK (sports design architect) and GMC (architect of record), the facility serves as a home away from home for players and staff, with amenities that allow the student-athletes to train, study, and unwind in the same place. Performance spaces include hydrotherapy rooms (both polar and thermal plunge pools), a lap pool, steam room, weight and fitness training centers, a 175-seat auditorium, NFL scout room, and technology for weight tracking and body composition. 

Additional leisure and entertainment amenities: outdoor basketball court, barbershop, volleyball and bocce courts, Gatorade fuel bar, and a Nike gear and championship display. It even has spaces dedicated for family visits, like an outdoor kitchen and grilling area, outdoor lounges with gas fire pits, a secluded bonfire pit with rocking chairs, a 20x20-foot inflatable screen for outdoor movies, an integrated family lounge in the player’s locker room, and a covered patio for 75 people. 

DPR Construction was the GC on the project.

 

Courtesy HOK.

 

Courtesy HOK.

Related Stories

University Buildings | Aug 22, 2018

Skanska completes James Madison University’s new dining hall

The three-story building will open for fall semester 2018.

University Buildings | Aug 14, 2018

Following in the Ryan Fieldhouse’s footsteps, Northwestern University’s Walter Athletics Center officially opens

Perkins+Will designed both the Ryan Fieldhouse and the new Walter Athletics Center.

University Buildings | Aug 6, 2018

Academic honors: The importance of residence halls

Three recent projects demonstrate the dynamic role residence halls are playing on America’s college and university campuses.

University Buildings | Jul 30, 2018

University trends 2018: Schools are desperately searching for ways to economize

Though the U.S. economy is strong with investment gains buoying endowments, colleges and universities face pressures to economize and stretch their capital budgets.

Multifamily Housing | Jul 13, 2018

Student housing vs. multifamily housing—what are the differences?

While student and multi-family housing share a common building form, it’s the student resident that drives the innovation of new spaces.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

University Buildings | Jun 25, 2018

Virginia Commonwealth has at least three major expansion projects under construction

New buildings for outpatient care, engineering, and rehabilitation of serious injuries and debilities are scheduled to be completed in 2020.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021