flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Former elementary school becomes modern office space in North Charleston

Office Buildings

Former elementary school becomes modern office space in North Charleston

The Middleton Group is designing the project.


By David Malone, Associate Editor | November 17, 2020
Ten Mile entrance

All images: The Middleton Group

Construction has begun on Ten Mile on Rivers, a 23,000-sf adaptive reuse project in North Charleston.

The project takes a former elementary school built in phases in the 1950s and 1960s and transforms it into 60s-inspired leasable modern office spaces. The space includes 200-sf single executive offices, small- and medium-sized suites, and the ability to combine contiguous spaces up to 12,000 sf.

 

Ten Mile Bathroom

 

The overall design of the project incorporates a mid-century modern style with a refreshed facade that introduces new entry elements that infuse a modern design aesthetic in the plain brick building. The interior will feature light-filled spaces with pops of color and textures inspired by the 1960s.

The renovation also includes a new roof and full MEP replacement and the addition of a new 175-space parking lot, which will preserve the 27 grand oak trees that exist onsite. Construction is slated for completion in spring of 2021.

 

Ten Mile Interior

Related Stories

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

| Mar 13, 2012

Worker office space to drop below 100-sf in five years

The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 1, 2012

Reconstruction Awards: Reinvesting in a neighborhood’s future

The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.

| Mar 1, 2012

Aragon Construction completes 67,000-sf build-out in NYC

Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.

boombox1
boombox2
native1

More In Category

Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021