Construction has begun on Ten Mile on Rivers, a 23,000-sf adaptive reuse project in North Charleston.
The project takes a former elementary school built in phases in the 1950s and 1960s and transforms it into 60s-inspired leasable modern office spaces. The space includes 200-sf single executive offices, small- and medium-sized suites, and the ability to combine contiguous spaces up to 12,000 sf.
The overall design of the project incorporates a mid-century modern style with a refreshed facade that introduces new entry elements that infuse a modern design aesthetic in the plain brick building. The interior will feature light-filled spaces with pops of color and textures inspired by the 1960s.
The renovation also includes a new roof and full MEP replacement and the addition of a new 175-space parking lot, which will preserve the 27 grand oak trees that exist onsite. Construction is slated for completion in spring of 2021.
Related Stories
| May 8, 2012
Skanska USA hires Zamrowski as senior project manager
In his new role at Skanska, Zamrowski will serve as the day-to-day on-site contact for select Pennsylvania-based projects during all phases of construction.
| May 3, 2012
Best commercial modular buildings and marketing programs recognized
Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.
| May 1, 2012
Time-lapse video: World Trade Center, New York
One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.
| May 1, 2012
Gilbane to build $100 million cranberries manufacturing facility
Gilbane to provide design build services for a new Lean manufacturing facility for Ocean Spray Cranberries Inc., beverage products.
| Apr 30, 2012
Summit Design + Build completes build-out for Office Concepts
The project is seeking LEED ID Silver certification from the U.S. Green Building Council.
| Apr 30, 2012
KBE Building completes renovation at the ConnCAT
The $1.2 million project consisted of a 16,000-sf interior renovation.
| Apr 27, 2012
GreenExpo365.com to offer webinars on EPA’s WaterSense Program
Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.
| Apr 27, 2012
China Mobile selects Leo A Daly to design three buildings at its new HQ
LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.