Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces.
With a design that uses significantly less energy than similar buildings, the Biomedical Research Building will outperform emission limits set by local law and is expected to perform 30% more efficiently than the commercial building benchmark. The facility also supports Columbia University’s plan to introduce no new fossil fuel infrastructure into campus buildings and to achieve campus-wide net-zero emissions by 2050.
Because laboratories have greater ventilation requirements than other buildings, they require more robust mechanical systems, which typically result in increased energy usage. The design team worked with sustainability consultant Atelier Ten to create an all-electric research lab building that could handle the facility’s high heating loads.
![Illustration: RGB, courtesy KPF](/sites/default/files/inline-images/11_Columbia%20Electric%20Lab_Section_Credit%20KPF_0.jpg)
The Biomedical Research Building is heated and cooled with electric air source heat pumps that allow for energy recovery between the heating and cooling fluids, providing periods of free tempering during the year. Air-side energy recovery systems use waste heat to reduce the total energy needed to condition the building.
The high-performance façade features a window-to-wall ratio below 50%. Exterior shading and a louver system reduce solar heat gain and glare while reflecting natural light into the labs.
The building’s design integrates biophilic elements such as green walls and natural and renewable materials in collaboration spaces. A large connecting stair encourages active circulation, and corner lounges foster collaboration among researchers.
On the Building Team:
Architect: Kohn Pedersen Fox (KPF)
MEP engineer: AKF Group
Structural engineer: Hatfield Group
Sustainability consultant: Atelier Ten
Lab planning consultant: Jacobs
Construction manager: LF Driscoll Healthcare
![Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF](/sites/default/files/inline-images/02_Columbia%20Electric%20Lab_Entry_Credit%20RGB%20Courtesy%20KPF.jpg)
![Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF](/sites/default/files/inline-images/03_ColumbiaElectric%20Lab_Street%20View_Credit%20KPF.jpg)
![Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF](/sites/default/files/inline-images/04_Columbia%20Electric%20Lab_Lobby_Credit%20RGB%20Courtesy%20KPF.jpg)
![Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF](/sites/default/files/inline-images/05_Columbia%20Electric%20Lab_Lab%20Space_Credit%20KPF.jpg)
![Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF](/sites/default/files/inline-images/06_Columbia%20Electric%20Lab_Lab%20Space%20w%20Mural_Credit%20KPF.jpg)
![Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF](/sites/default/files/inline-images/07_Columbia%20Electric%20Lab_Stair%20and%20Lounge_Credit%20KPF.jpg)
![Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF](/sites/default/files/inline-images/08_Columbia%20Electric%20Lab_Symposium_Credit%20KPF.jpg)
![Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF](/sites/default/files/inline-images/09_Columbia%20Electric%20Lab_Axo_Credit%20KPF.jpg)
![Columbia University to begin construction on New York City’s first all-electric academic research building, designed by KPF](/sites/default/files/inline-images/10_Columbia%20Electric%20Lab_Axo%20Stair_Credit%20KPF.jpg)
Related Stories
| Jul 11, 2014
$44.5 million Centennial Hall opens at University of Wisconsin-Eau Claire
Centennial Hall houses the College of Education and Human Sciences and consolidates teacher education. It is the first new academic building on the UW-Eau Claire campus in more than 30 years.
| Jul 10, 2014
Berkeley Lab opens 'world's most comprehensive building efficiency simulator'
DOE’s new FLEXLAB is a first-of-its-kind simulator that lets users test energy-efficient building systems individually or as an integrated system, under real-world conditions.
| Jul 9, 2014
Harvard Business School to build large-scale conference center
Expected to open in 2018, the facility will combine the elements of a large-scale conference center, a performance space, and an intimate community forum. The new building will be designed by Boston-based William Rawn and Associates.
| Jul 7, 2014
7 emerging design trends in brick buildings
From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick.
Sponsored | | Jul 7, 2014
Channel glass illuminates science at the University of San Francisco
The University of San Francisco’s new John Lo Schiavo Center for Science and Innovation brings science to the forefront of academic life. Its glossy, three-story exterior invites students into the facility, and then flows sleekly down into the hillside where below-grade laboratories and classrooms make efficient use of space on the landlocked campus.
| Jul 2, 2014
Emerging trends in commercial flooring
Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.
| Jun 30, 2014
Research finds continued growth of design-build throughout United States
New research findings indicate that for the first time more than half of projects above $10 million are being completed through design-build project delivery.
| Jun 18, 2014
Arup uses 3D printing to fabricate one-of-a-kind structural steel components
The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.
| Jun 16, 2014
6 U.S. cities at the forefront of innovation districts
A new Brookings Institution study records the emergence of “competitive places that are also cool spaces.”
| Jun 12, 2014
Tod Williams Billie Tsien Architects' design selected for new UCSC facility
The planned site is a natural landscape among redwood trees with views over Monterey Bay, a site that the architects have called “one of the most beautiful they have ever worked on.”