flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cherokee County Detention Center renovation completes

Government Buildings

Cherokee County Detention Center renovation completes

CROFT designed the project.


By David Malone, Managing Editor | February 16, 2022
Cherokee Adult Detention Center exterior
All photos: Jason Buch

The 225,000-sf Cherokee County Adult Detention Center was first completed in 2002, but has recently undergone a renovation project that included the addition of more than 110,000-sf of space to keep up with the county’s growing needs.

Through the expansion, the Center acquired a 582-bed housing tower composed of precast concrete modular cells with structural precast walls and floors, a load bearing CMU, and elevated cast-in-place concrete. 21-day rooms were specially designed for indirect supervision from elevated control towers and three exercise yards. Additional renovations took place in the kitchen, staff dining area, laundry facilities, visitation areas, the lobby, and the master control.

Cherokee Adult Detention Center inmate cell

The existing kitchen was expanded to accommodate the increased number of meals needing to be prepared. The staff dining area was given improved finishes to create a more pleasing environment. The main control room was modified to increase the monitoring capabilities of the Sheriff’s staff to view all movement within the detention center.

Several previously unused areas were reinstated, including the original main detention entrance that had been unused for years by staff and the public. The area was renovated and modified to become the new video visitation site, creating a safe and efficient way for visitors to speak with inmates.

Cherokee Adult Detention Center secure pod area

New public restrooms for visitors, a secure control station for the Sheriff’s staff to monitor visitor activities, 29 video visitation stations, space for 22 additional monitors, and six private attorney video visitation booths were also added.

CROFT provided the architectural design and construction administration services for the renovation/new service areas for the project. CROFT also served as a partner to Studio 8 for the housing pod addition and served as the construction administration lead for the 117,000 sq. ft., 600 bed addition to the Cherokee County Jail.

Related Stories

| Nov 3, 2014

An ancient former post office in Portland, Ore., provides an even older art college with a new home

About seven years ago, The Pacific Northwest College of Art, the oldest art college in Portland, was evaluating its master plan with an eye towards expanding and upgrading its campus facilities. A board member brought to the attention of the college a nearby 134,000-sf building that had once served as the city’s original post office.

Sponsored | | Oct 23, 2014

From slots to public safety: Abandoned Detroit casino transformed into LEED-certified public safety headquarters

First constructed as an office for the Internal Revenue Service, the city's new public safety headquarters had more recently served as a temporary home for the MGM Casino. SPONSORED CONTENT

| Oct 19, 2014

White House Visitor Center reopens in Washington, D.C.

Designed by SmithGroupJJR and Gallagher & Associates, renovated center shows public its unique role as office, stage, museum, park, and home.

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

| Oct 15, 2014

Harvard launches ‘design-centric’ center for green buildings and cities

The impetus behind Harvard's Center for Green Buildings and Cities is what the design school’s dean, Mohsen Mostafavi, describes as a “rapidly urbanizing global economy,” in which cities are building new structures “on a massive scale.” 

| Oct 14, 2014

Proven 6-step approach to treating historic windows

This course provides step-by-step prescriptive advice to architects, engineers, and contractors on when it makes sense to repair or rehabilitate existing windows, and when they should advise their building owner clients to consider replacement. 

| Oct 12, 2014

AIA 2030 commitment: Five years on, are we any closer to net-zero?

This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030. 

| Oct 9, 2014

Beyond the bench: Meet the modern laboratory facility

Like office workers escaping from the perceived confines of cubicles, today’s scientists have been freed from the trappings of the typical lab bench, writes Perkins+Will's Bill Harris.

| Oct 6, 2014

Frank Gehry's $100 million Eisenhower Memorial gets preliminary approval

After a rejection earlier in the year, Frank Gehry has gotten some good news: his revised design for the Dwight D. Eisenhower Memorial has received approval from the National Capital Planning Commission.

| Oct 2, 2014

Budget busters: Report details 24 of the world's most obscenely over-budget construction projects

Montreal's Olympic Stadium and the Sydney Opera House are among the landmark projects to bust their budgets, according to a new interactive graph by Podio. 

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021