flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cherokee County Detention Center renovation completes

Government Buildings

Cherokee County Detention Center renovation completes

CROFT designed the project.


By David Malone, Managing Editor | February 16, 2022
Cherokee Adult Detention Center exterior
All photos: Jason Buch

The 225,000-sf Cherokee County Adult Detention Center was first completed in 2002, but has recently undergone a renovation project that included the addition of more than 110,000-sf of space to keep up with the county’s growing needs.

Through the expansion, the Center acquired a 582-bed housing tower composed of precast concrete modular cells with structural precast walls and floors, a load bearing CMU, and elevated cast-in-place concrete. 21-day rooms were specially designed for indirect supervision from elevated control towers and three exercise yards. Additional renovations took place in the kitchen, staff dining area, laundry facilities, visitation areas, the lobby, and the master control.

Cherokee Adult Detention Center inmate cell

The existing kitchen was expanded to accommodate the increased number of meals needing to be prepared. The staff dining area was given improved finishes to create a more pleasing environment. The main control room was modified to increase the monitoring capabilities of the Sheriff’s staff to view all movement within the detention center.

Several previously unused areas were reinstated, including the original main detention entrance that had been unused for years by staff and the public. The area was renovated and modified to become the new video visitation site, creating a safe and efficient way for visitors to speak with inmates.

Cherokee Adult Detention Center secure pod area

New public restrooms for visitors, a secure control station for the Sheriff’s staff to monitor visitor activities, 29 video visitation stations, space for 22 additional monitors, and six private attorney video visitation booths were also added.

CROFT provided the architectural design and construction administration services for the renovation/new service areas for the project. CROFT also served as a partner to Studio 8 for the housing pod addition and served as the construction administration lead for the 117,000 sq. ft., 600 bed addition to the Cherokee County Jail.

Related Stories

| Sep 24, 2014

Architecture billings see continued strength, led by institutional sector

On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

| Sep 22, 2014

Sound selections: 12 great choices for ceilings and acoustical walls

From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products. 

| Sep 15, 2014

Ranked: Top international AEC firms [2014 Giants 300 Report]

Parsons Brinckerhoff, Gensler, and Jacobs top BD+C's rankings of U.S.-based design and construction firms with the most revenue from international projects, as reported in the 2014 Giants 300 Report.

| Sep 14, 2014

Ranked: Top Veterans Administration sector AEC firms [2014 Giants 300 Report]

CannonDesign, Clark Group, and URS top BD+C's rankings of the nation's largest Veterans Administration building sector design and construction firms, as reported in the 2014 Giants 300 Report.  

| Sep 9, 2014

Using Facebook to transform workplace design

As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.

| Sep 7, 2014

Ranked: Top state government sector AEC firms [2014 Giants 300 Report]

PCL Construction, Stantec, and AECOM head BD+C's rankings of the nation's largest state government design and construction firms, as reported in the 2014 Giants 300 Report.  

| Sep 7, 2014

Behind the scenes of integrated project delivery — successful tools and applications

The underlying variables and tools used to manage collaboration between teams is ultimately the driving for success with IPD, writes CBRE Healthcare's Megan Donham.

| Sep 7, 2014

Ranked: Top military sector AEC firms [2014 Giants 300 Report]

Balfour Beatty, Fluor, and HDR top BD+C's rankings of the nation's largest military sector design and construction firms, as reported in the 2014 Giants 300 Report.

| Sep 4, 2014

Ranked: Top courthouse sector AEC firms [2014 Giants 300 Report]

Fentress Architects, Tutor Perini, and AECOM top BD+C's rankings of design and construction firms with the most revenue from courthouse facilities, as reported in the 2014 Giants 300 Report.

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021