The new Chippewa Champions Center has completed at Central Michigan University’s Kelly/Shorts Stadium.
The 50,000-sf project is a year-round facility that will serve the entirety of Central Michigan University. It includes a 7,000-sf state-of-the-art weight room, nutrition fuel stations, and an expanded sports medicine and rehabilitation facility. Multi-purpose, flexible meeting and academic space will fill a campus need for meeting and event space.
The $30 million facility also includes a 4,200-sf football locker room, a new equipment room, a laundry room, a video operations room, and support operations. The new space will support recruitment for the football program and transform the game day experience at Kelly/Shorts Stadium.
On game days, the 4,000-sf Isabella Bank VIP Club, located directly behind the north end zone, offers both climate-controlled and outdoor patio spaces. Sixteen new loge boxes on the second level offer a premium seating experience, blending a traditional club seat and a private suite experience with two TVs in each box.
The facility also provides non-game day partnership opportunities with space for state-of-the-art training experiences for CMU students enrolled in The Herbert H. and Grace A. Dow College of Health Professions and the College of Medicine. It will also create real-world opportunities for students in marketing and hospitality, broadcast and cinematic arts, and integrative public relations.
Related Stories
| Jul 19, 2013
Reconstruction Sector Engineering Firms [2013 Giants 300 Report]
URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Architecture Firms [2013 Giants 300 Report]
Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.
| Jul 19, 2013
Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]
Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.
| Jul 2, 2013
LEED v4 gets green light, will launch this fall
The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.
| Jul 1, 2013
Report: Global construction market to reach $15 trillion by 2025
A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.
| Jun 28, 2013
Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report
A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals.
| Jun 17, 2013
DOE launches database on energy performance of 60,000 buildings
The Energy Department today launched a new Buildings Performance Database, the largest free, publicly available database of residential and commercial building energy performance information.
| Jun 11, 2013
Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]
Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.
| Jun 5, 2013
USGBC: Free LEED certification for projects in new markets
In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.
| Jun 3, 2013
Construction spending inches upward in April
The U.S. Census Bureau of the Department of Commerce announced today that construction spending during April 2013 was estimated at a seasonally adjusted annual rate of $860.8 billion, 0.4 percent above the revised March estimate of $857.7 billion.