The new Chippewa Champions Center has completed at Central Michigan University’s Kelly/Shorts Stadium.
The 50,000-sf project is a year-round facility that will serve the entirety of Central Michigan University. It includes a 7,000-sf state-of-the-art weight room, nutrition fuel stations, and an expanded sports medicine and rehabilitation facility. Multi-purpose, flexible meeting and academic space will fill a campus need for meeting and event space.
The $30 million facility also includes a 4,200-sf football locker room, a new equipment room, a laundry room, a video operations room, and support operations. The new space will support recruitment for the football program and transform the game day experience at Kelly/Shorts Stadium.
On game days, the 4,000-sf Isabella Bank VIP Club, located directly behind the north end zone, offers both climate-controlled and outdoor patio spaces. Sixteen new loge boxes on the second level offer a premium seating experience, blending a traditional club seat and a private suite experience with two TVs in each box.
The facility also provides non-game day partnership opportunities with space for state-of-the-art training experiences for CMU students enrolled in The Herbert H. and Grace A. Dow College of Health Professions and the College of Medicine. It will also create real-world opportunities for students in marketing and hospitality, broadcast and cinematic arts, and integrative public relations.
Related Stories
Smart Buildings | Apr 28, 2014
Cities Alive: Arup report examines latest trends in urban green spaces
From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 8, 2014
Science, engineering find common ground on the Northeastern University campus [slideshow]
The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 12, 2014
14 new ideas for doors and door hardware
From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations.
| Feb 25, 2014
Are these really the 'world's most spectacular university buildings'? [slideshow]
Emporis lists its top 13 higher education buildings from around the world. Do you agree with the rankings?
| Feb 24, 2014
First look: UC San Diego opens net-zero biological research lab
The facility is intended to be "the most sustainable laboratory in the world," and incorporates natural ventilation, passive cooling, high-efficiency plumbing, and sustainably harvested wood.