flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CannonDesign launches REALIZE Life Safety Solutions

Building Team

CannonDesign launches REALIZE Life Safety Solutions

“The Final Rule presents a considerable update to the life safety directives most healthcare systems have become accustomed to,” says Joe Cassata, principal at CannonDesign.


By CannonDesign | January 6, 2017

Photo courtesy CannonDesign

In response to changes to the Centers for Medicare & Medicaid Services (CMS) Life Safety Code, CannonDesign has launched REALIZE Life Safety Solutions — a suite of services and software solutions focused on helping healthcare facilities teams assess their compliance with life safety code standards related to CFR 482.41 — Condition of participation: Physical environment — without operational disruptions.

Named the No. 4 facility management provider within an A/E firm by the “World Architecture 100,” CannonDesign created REALIZE Life Safety Solutions to help clients navigate through CMS’s most recent Final Rule, which adopted the National Fire Protection Association’s 2012 edition of the Life Safety Code (NFPA 101), as well as provisions of the NFPA’s 2012 edition of the Health Care Facilities Code (NFPA 99). All health facilities that participate in Medicare and/or Medicaid must comply with these code changes.

“The Final Rule presents a considerable update to the life safety directives most healthcare systems have become accustomed to,” says Joe Cassata, principal at CannonDesign. “The last time a change in the Life Safety Code was made was in 2003 when CMS adopted the 2000 edition. Sorting through the new changes and understanding how they apply to individual facilities is a daunting task, which is why we’re launching this offering.”

With experience assessing more than 200 million SF of space, life safety is not a new service area for CannonDesign. However, REALIZE Life Safety Solutions packages the firm’s life safety services into an easily customizable offering focused on three primary areas:

 

  1. Life Safety Current State: Life safety drawings review, field verification, and key findings report of current Life Safety for owned or leased facilities.
  2. Code Review: Review and report of physical conditions based on 2012 Life Safety Codes.
  3. Corrective Action Plan: Corrective action report containing prioritized deficiencies, cost estimates and recommendations for remediation.

 

“Most health systems have received a life safety deficiency,” adds Cassata. “Sometimes the deficiencies are minor and easily fixed, while other times they require significant facility modifications to prevent steep fines, possible terminated Medicare/Medicaid reimbursements, and even possible closure. Regardless of the scenario, we have the knowledge and expertise needed to get our clients to a place where can have absolute confidence in their Life Safety Code compliance.”

Related Stories

Cultural Facilities | Feb 25, 2015

Edmonton considering 'freezeway' to embrace winter

If the new Edmonton Freezeway is constructed, residents will have an 11-km course that winds through the city and allows them to skate to work, school, and other city activities.

Sponsored | Building Team | Feb 24, 2015

What your employees really want

Here are key aspects of a job that keep employees happy

Building Team | Feb 24, 2015

Call for entries: 2015 Giants 300 survey

The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue. 

| Feb 23, 2015

Where are the iconic green buildings?

What does a green building look like? How would you know one if you saw one? Maybe a trivial question to some, but of great interest to architects, designers, and other members of the Building Team as the rapid evolution of sustainable buildings continues apace.

Engineers | Feb 20, 2015

PwC reports record year for M&A activity in engineering and construction

Worldwide engineering and construction industries closed 218 M&A deals in 2014 worth more than $172 billion, according to a PwC report.

Building Materials | Feb 19, 2015

Prices for construction materials fall in January, following plummet of oil prices

The decline in oil and petroleum prices finally showed up in the produce price index data, according to ABC Chief Economist Anirban Basu.

Sponsored | Building Team | Feb 17, 2015

Why diversity matters

Companies in the top quartile for gender or racial and ethnic diversity are more likely to have financial returns above their national industry medians.

Sponsored | Modular Building | Feb 17, 2015

When lava flow in Hawaii threatens a public school district, officials turn to modular

Hawaii Modular Space, a Williams Scotsman company, designed temporary classroom space for the Pahoa and Keeau schools that would become displaced due to ongoing lava flow in Pahoa, Hawaii.

Mixed-Use | Feb 13, 2015

First Look: Sacramento Planning Commission approves mixed-use tower by the new Kings arena

The project, named Downtown Plaza Tower, will have 16 stories and will include a public lobby, retail and office space, 250 hotel rooms, and residences at the top of the tower. 

Architects | Feb 13, 2015

OMA commissioned to design newest New York High Line addition

Rem Koolhaas is the latest addition to the list of starchitects working on projects near the High Line elevated park.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021