flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CannonDesign launches REALIZE Life Safety Solutions

Building Team

CannonDesign launches REALIZE Life Safety Solutions

“The Final Rule presents a considerable update to the life safety directives most healthcare systems have become accustomed to,” says Joe Cassata, principal at CannonDesign.


By CannonDesign | January 6, 2017

Photo courtesy CannonDesign

In response to changes to the Centers for Medicare & Medicaid Services (CMS) Life Safety Code, CannonDesign has launched REALIZE Life Safety Solutions — a suite of services and software solutions focused on helping healthcare facilities teams assess their compliance with life safety code standards related to CFR 482.41 — Condition of participation: Physical environment — without operational disruptions.

Named the No. 4 facility management provider within an A/E firm by the “World Architecture 100,” CannonDesign created REALIZE Life Safety Solutions to help clients navigate through CMS’s most recent Final Rule, which adopted the National Fire Protection Association’s 2012 edition of the Life Safety Code (NFPA 101), as well as provisions of the NFPA’s 2012 edition of the Health Care Facilities Code (NFPA 99). All health facilities that participate in Medicare and/or Medicaid must comply with these code changes.

“The Final Rule presents a considerable update to the life safety directives most healthcare systems have become accustomed to,” says Joe Cassata, principal at CannonDesign. “The last time a change in the Life Safety Code was made was in 2003 when CMS adopted the 2000 edition. Sorting through the new changes and understanding how they apply to individual facilities is a daunting task, which is why we’re launching this offering.”

With experience assessing more than 200 million SF of space, life safety is not a new service area for CannonDesign. However, REALIZE Life Safety Solutions packages the firm’s life safety services into an easily customizable offering focused on three primary areas:

 

  1. Life Safety Current State: Life safety drawings review, field verification, and key findings report of current Life Safety for owned or leased facilities.
  2. Code Review: Review and report of physical conditions based on 2012 Life Safety Codes.
  3. Corrective Action Plan: Corrective action report containing prioritized deficiencies, cost estimates and recommendations for remediation.

 

“Most health systems have received a life safety deficiency,” adds Cassata. “Sometimes the deficiencies are minor and easily fixed, while other times they require significant facility modifications to prevent steep fines, possible terminated Medicare/Medicaid reimbursements, and even possible closure. Regardless of the scenario, we have the knowledge and expertise needed to get our clients to a place where can have absolute confidence in their Life Safety Code compliance.”

Related Stories

Office Buildings | Apr 1, 2015

IBM's supercomputer Watson finds new home in Manhattan's Silicon Alley

The new headquarters for the former Jeopardy champ was conceived as a showcase for Watson’s capabilities, and as an inspirational workspace for Millennials and idea generators of all ages.

Sponsored | Fire and Life Safety | Apr 1, 2015

Radiant Heat: The Invisible Killer

Where there’s smoke, there’s fire. Where there’s fire, there’s the deadly threat of radiant heat.

Modular Building | Mar 31, 2015

Phoenix apartment complex will be made from recycled shipping containers

The eight-unit complex, called Containers on Grand, was inspired by the need for affordable and sustainable housing near the city's core.

Multifamily Housing | Mar 27, 2015

Bathroom fixtures get a starchitect makeover by Bjarke Ingels

This Danish starchitect elevates the toilet paper holder (and other bathroom accessories).

Architects | Mar 27, 2015

Illustrator Federico Babina explores architecture as animals

When you pay attention, the Eiffel Tower really does look like a giraffe.

Transit Facilities | Mar 25, 2015

Kengo Kuma selected to design new Paris Metro station

The new station will serve as a hub to connect Paris' northern suburbs with the core.

Government Buildings | Mar 23, 2015

SOM leads planning for Egypt’s new $45 billion capital city

To alleviate overcrowding and congestion in Cairo, the Egyptian government is building a new capital from scratch.

Sports and Recreational Facilities | Mar 19, 2015

Populous design wins competition for UK's most sustainable arena

The live-concert venue will seat an audience of 12,000, which the firm says will be masked by “the atmosphere and intimacy of a 4,000-seat amphitheatre.” 

Multifamily Housing | Mar 18, 2015

Prefabricated skycubes proposed with 'elastic' living apartments inside

The interiors for each unit are designed using an elastic living concept, where different spaces are created by sliding on tracks.

Sponsored | | Mar 17, 2015

Are face-to-face meetings still important?

One CEO looks pass convenience and advocates for old school, in-person meetings.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021