flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CannonDesign launches REALIZE Life Safety Solutions

Building Team

CannonDesign launches REALIZE Life Safety Solutions

“The Final Rule presents a considerable update to the life safety directives most healthcare systems have become accustomed to,” says Joe Cassata, principal at CannonDesign.


By CannonDesign | January 6, 2017

Photo courtesy CannonDesign

In response to changes to the Centers for Medicare & Medicaid Services (CMS) Life Safety Code, CannonDesign has launched REALIZE Life Safety Solutions — a suite of services and software solutions focused on helping healthcare facilities teams assess their compliance with life safety code standards related to CFR 482.41 — Condition of participation: Physical environment — without operational disruptions.

Named the No. 4 facility management provider within an A/E firm by the “World Architecture 100,” CannonDesign created REALIZE Life Safety Solutions to help clients navigate through CMS’s most recent Final Rule, which adopted the National Fire Protection Association’s 2012 edition of the Life Safety Code (NFPA 101), as well as provisions of the NFPA’s 2012 edition of the Health Care Facilities Code (NFPA 99). All health facilities that participate in Medicare and/or Medicaid must comply with these code changes.

“The Final Rule presents a considerable update to the life safety directives most healthcare systems have become accustomed to,” says Joe Cassata, principal at CannonDesign. “The last time a change in the Life Safety Code was made was in 2003 when CMS adopted the 2000 edition. Sorting through the new changes and understanding how they apply to individual facilities is a daunting task, which is why we’re launching this offering.”

With experience assessing more than 200 million SF of space, life safety is not a new service area for CannonDesign. However, REALIZE Life Safety Solutions packages the firm’s life safety services into an easily customizable offering focused on three primary areas:

 

  1. Life Safety Current State: Life safety drawings review, field verification, and key findings report of current Life Safety for owned or leased facilities.
  2. Code Review: Review and report of physical conditions based on 2012 Life Safety Codes.
  3. Corrective Action Plan: Corrective action report containing prioritized deficiencies, cost estimates and recommendations for remediation.

 

“Most health systems have received a life safety deficiency,” adds Cassata. “Sometimes the deficiencies are minor and easily fixed, while other times they require significant facility modifications to prevent steep fines, possible terminated Medicare/Medicaid reimbursements, and even possible closure. Regardless of the scenario, we have the knowledge and expertise needed to get our clients to a place where can have absolute confidence in their Life Safety Code compliance.”

Related Stories

Resort Design | Mar 16, 2015

Giancarlo Zema Design Group unveils plans for semi-submerged resort in Qatar

The resort will have four semi-submerged hotels that look similar to super-yachts, each including 75 luxury suites with private terraces.

Mixed-Use | Mar 13, 2015

Dubai announces mega waterfront development Aladdin City

Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.

Contractors | Mar 13, 2015

Construction materials prices rise for first time in six months

The largest monthly gain in petroleum prices in over three years caused construction materials prices to expand 0.4% in February, ending a six-month streak when prices failed to rise, according to the Bureau of Labor Statistics.

High-rise Construction | Mar 12, 2015

Foster and Partners designs 'The One' in Toronto

Developer Sam Mizrahi worked with Foster and Partners and Core Architects to design Toronto's tallest skyscraper aside from the CN Tower, The One, which will house a luxury shopping mall and condos.

Contractors | Mar 12, 2015

Construction demand exploding in 2015, but costs complicate recovery

Raw materials and labor costs temper expectations for soaring profits.

Modular Building | Mar 10, 2015

Must see: 57-story modular skyscraper was completed in 19 days

After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”

Sponsored | Metals | Mar 10, 2015

Metal Building Systems: A Rising Star in the Market

A new report by the Metal Building Manufacturer's Association explains the entity's efforts in refining and extending metal building systems as a construction choice.

Retail Centers | Mar 10, 2015

Retrofit projects give dying malls new purpose

Approximately one-third of the country’s 1,200 enclosed malls are dead or dying. The good news is that a sizable portion of that building stock is being repurposed.

Retail Centers | Mar 10, 2015

Orlando's Skyscraper to be world's tallest roller coaster

The Skyscraper is expected to begin construction later this year, and open in 2016. It will stand at 570 feet. 

Museums | Mar 9, 2015

Architecture based on astronomy principles for new planetarium in Shanghai

The ancient Chinese civilization left some of the earliest records of humans studying the stars and skies. To exhibit this long history, a new planetarium and astronomy museum is planned for construction in Shanghai.

boombox1
boombox2
native1

More In Category




Giants 400

Top 75 Engineering Firms for 2023

Kimley-Horn, WSP, Tetra Tech, Langan, and IMEG head the rankings of the nation's largest engineering firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021