Global real estate companies Lendlease and Ivanhoé Cambridge recently announced the topping-out of FORUM, a nine-story, 350,000-sf life sciences building in Boston. Located in Boston Landing, a 15-acre mixed-use community, the $545 million project will achieve operational net zero carbon upon completion in 2024.
FORUM’s flexible, 50,000-sf floorplates can accommodate multiple or single-floor tenants in both laboratory and office spaces. Its state-of-the-art mechanical and electrical infrastructure has been engineered to support cutting-edge research and development.
The design by SGA emphasizes the facility’s forward-looking focus, with a curvilinear façade punctuated with copper metal panels and tripled-glazed glass. In addition to a landscaped plaza leading to the double-height lobby, the publicly accessible areas include a community living room and café that can be used for both the building’s and the neighborhood’s programming. The first floor also features an art gallery that will showcase rotating works by local artists.
On the third floor, collaboration spaces in the conference center will serve a variety of meeting sizes and configurations. The third floor also will offer shared tenant amenities, including a kitchen and eating area, plus a 7,000-sf outdoor terrace with cabanas, seating areas, and grilling stations. Private terraces will be available for some tenant spaces.
The façade will integrate 1,600 sf of photovoltaic solar, and a rainwater cistern will reuse captured rainwater for building facilities. The 284-stall parking garage will include electric vehicle charging stations. The building also will have storage for 146 bicycles and on-site locker rooms. The project is targeting LEED Platinum, WiredScore Platinum, and Fitwel certification.
“FORUM reinforces Boston’s reputation as a global hub for medical and biological research while establishing Boston Landing as a destination for leading life sciences companies,” Mark Barer, director of development, Boston, Lendlease, said in a statement.
On the Building Team:
Owner/developer: Lendlease and Ivanhoé Cambridge
Design architect and architect of record: SGA
MEP engineer: BR+A Consulting Engineers
Structural engineer: McNamara Salvia
Construction: Consigli Construction
Related Stories
Laboratories | Apr 1, 2019
The Karolinska Institute’s new laboratory building
C.F. Møller Architects designed the building.
| Mar 21, 2019
Preserving Edison's "Corporate" R&D Lab in West Orange, N.J.
Report on Thomas Edison's West Orange, N.J., Laboratory.
Mixed-Use | Oct 25, 2018
Philadelphia’s uCity Square kicks off major expansion drive
This innovation center has several office, lab, and residential buildings in the works.
University Buildings | Jul 5, 2018
Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%
KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.
Laboratories | Jun 18, 2018
A Massachusetts research building is the first to meet WELL’s Gold standard
Design changes in lighting and HVAC systems were required to meet compliance criteria.
Laboratories | May 21, 2018
Virtual Design and Construction Technology helped design MIT’s new accelerator facility
SGA designed the incubator space.
Laboratories | Feb 26, 2018
Three trends shaping labs of the future
It’s all about flexibility and talent for the future of life sciences.
University Buildings | Feb 16, 2018
The University of Washington receives a new Nanoengineering and Sciences Building
The building marks the second phase of a 168,000-sf complex.
Laboratories | Feb 15, 2018
Mass science: Superlab design best practices
What are superlabs? And what makes for a superbly designed superlab?
Reconstruction & Renovation | Feb 7, 2018
Renovations begin on an underground facility that is investigating the nature of dark matter
This LEO A DALY-designed project makes way to produce the world’s most sensitive detector to this point.