flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Boston’s FORUM building to support cutting-edge life sciences research and development

Laboratories

Boston’s FORUM building to support cutting-edge life sciences research and development

The $545 million, 350,000-sf facility also will offer publicly accessible areas, including an art gallery, and will achieve operational net zero carbon.


By Novid Parsi, Contributing Editor | November 8, 2023
Boston’s FORUM building to support cutting-edge life science research and development
Lendlease and Ivanhoé Cambridge have topped out FORUM, a nine-story, 350,000-square-foot life science and office building at 60 Guest St., within the Boston Landing mixed-use district in Boston’s Allston-Brighton neighborhood.

Global real estate companies Lendlease and Ivanhoé Cambridge recently announced the topping-out of FORUM, a nine-story, 350,000-sf life sciences building in Boston. Located in Boston Landing, a 15-acre mixed-use community, the $545 million project will achieve operational net zero carbon upon completion in 2024.

FORUM’s flexible, 50,000-sf floorplates can accommodate multiple or single-floor tenants in both laboratory and office spaces. Its state-of-the-art mechanical and electrical infrastructure has been engineered to support cutting-edge research and development.

The design by SGA emphasizes the facility’s forward-looking focus, with a curvilinear façade punctuated with copper metal panels and tripled-glazed glass. In addition to a landscaped plaza leading to the double-height lobby, the publicly accessible areas include a community living room and café that can be used for both the building’s and the neighborhood’s programming. The first floor also features an art gallery that will showcase rotating works by local artists.

On the third floor, collaboration spaces in the conference center will serve a variety of meeting sizes and configurations. The third floor also will offer shared tenant amenities, including a kitchen and eating area, plus a 7,000-sf outdoor terrace with cabanas, seating areas, and grilling stations. Private terraces will be available for some tenant spaces.

The façade will integrate 1,600 sf of photovoltaic solar, and a rainwater cistern will reuse captured rainwater for building facilities. The 284-stall parking garage will include electric vehicle charging stations. The building also will have storage for 146 bicycles and on-site locker rooms. The project is targeting LEED Platinum, WiredScore Platinum, and Fitwel certification.

“FORUM reinforces Boston’s reputation as a global hub for medical and biological research while establishing Boston Landing as a destination for leading life sciences companies,” Mark Barer, director of development, Boston, Lendlease, said in a statement.

On the Building Team:
Owner/developer: Lendlease and Ivanhoé Cambridge
Design architect and architect of record: SGA
MEP engineer: BR+A Consulting Engineers
Structural engineer: McNamara Salvia
Construction: Consigli Construction

Related Stories

Laboratories | Jul 17, 2022

Renovation is filling the need for life sciences lab space

Three experts from the firm DiMella Shaffer discuss the advantages and challenges of converting existing buildings.

Laboratories | Jun 29, 2022

The "collaboratory" brings digital innovation to the classroom

The Collaboratory—a mix of collaboration and laboratory—is a networking center being designed at the University of Denver’s College of Business.

Museums | Jun 28, 2022

The California Science Center breaks grounds on its Air and Space Center

The California Science Center—a hands-on science center in Los Angeles—recently broke ground on its Samuel Oschin Air and Space Center.

University Buildings | Jun 7, 2022

Newfoundland university STEM building emulates natural elements, local traditions

Memorial University of Newfoundland (MUN) recently opened a new building that will provide interdisciplinary learning and research space for Faculties of Science and Engineering.

Laboratories | May 20, 2022

Brutalist former Berkeley Art Museum transformed into modern life science lab

After extensive renovation and an addition, the former Berkeley Art Museum and Pacific Film Archive at the University of California, Berkeley campus reopened in May 2022 as a modern life science lab building.

Laboratories | Apr 29, 2022

Oracle Industry Lab in Chicago enables development of solutions for multiple industries

The Oracle Industry Lab in Chicago, which provides customers in multiple industries the opportunity to test new technologies, recently opened.

Laboratories | Apr 7, 2022

North Carolina's latest play for biotech real estate development

The Tar Heel State is among a growing number of markets rolling out the welcome mat for lab spaces.

Projects | Mar 11, 2022

Studying science in the sky

In sharp contrast to other types of commercial real estate, the life sciences market is booming, according to SGA, an architecture firm based in Boston and New York that has extensive experience designing life sciences buildings.

Laboratories | Feb 10, 2022

Historic building becomes a research science incubator

Svigals + Partners designed the project.

Laboratories | Feb 8, 2022

A new concept for science buildings emphasizes construction speed and design flexibility

The NEXT prototype—devised by Gensler, KPFF, and Buro Happold—also leans toward decarbonization and wellness.

boombox1
boombox2
native1

More In Category




Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021