BBS Architects & Engineers (BBS) completed the 22,400-sf St. Charles Resurrection Cemetery Welcoming and Information Center in Farmingdale, NY. The building is currently undergoing the LEED certification process with the LEED Silver level target. The center received the 2011 Jeffrey J. Zogg Build New York Award.
BBS, a greater New York area architect and designer of green institutional, educational and corporate facilities, served as architect, interior designer, and MEP engineer. Catholic Cemeteries, owned and operated by Saint John’s Cemetery, is the center’s owner. In addition to BBS, the team included general contractor Lipsky Enterprises, structural engineer Ysrael A. Seinuk, P.C. and site and landscape designer Greenman-Pedersen, Inc.
The new structure serves as the cemetery's focal architectural point and center of operations. It houses the visitor's center, chapel, public spaces, and offices. The project encompassed ground-up construction of the center's structure, all interior finishes, utilities and building systems, and development of the surrounding five-acre site that includes a surface parking area, circulation roads, utility connections, and sustainable landscaping and water management techniques. BD+C
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.