BBS Architects & Engineers (BBS) completed the 22,400-sf St. Charles Resurrection Cemetery Welcoming and Information Center in Farmingdale, NY. The building is currently undergoing the LEED certification process with the LEED Silver level target. The center received the 2011 Jeffrey J. Zogg Build New York Award.
BBS, a greater New York area architect and designer of green institutional, educational and corporate facilities, served as architect, interior designer, and MEP engineer. Catholic Cemeteries, owned and operated by Saint John’s Cemetery, is the center’s owner. In addition to BBS, the team included general contractor Lipsky Enterprises, structural engineer Ysrael A. Seinuk, P.C. and site and landscape designer Greenman-Pedersen, Inc.
The new structure serves as the cemetery's focal architectural point and center of operations. It houses the visitor's center, chapel, public spaces, and offices. The project encompassed ground-up construction of the center's structure, all interior finishes, utilities and building systems, and development of the surrounding five-acre site that includes a surface parking area, circulation roads, utility connections, and sustainable landscaping and water management techniques. BD+C
Related Stories
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.