flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

17-story Data Sciences building to rise on Boston University campus

University Buildings

17-story Data Sciences building to rise on Boston University campus

KPMB Architects is designing the project.


By David Malone, Associate Editor | April 9, 2019
BU data sciences building

All renderings courtesy KPMB

The design of Boston University’s Data Science building is sure to turn some heads when it completes in 2022. The 17-story, 345,000-sf building will resemble a stack of books rising up from a podium on the university’s central campus. For the first time, BU’s mathematics, statistics, and computer science departments will be under one roof, maximizing collaboration, interaction, and interconnectivity.

The building’s transparent, porous podium will occupy the entire width of the site to complete the streetscape and generate maximum group floor animation on Commonwealth Avenue. It will rise four-stories and accommodate the larger programmatic volumes and offer a series of zones for interaction, including the Cafe, the Cascading Stair, the Street Studio, and the Fireplace Lounge.

 

Data Sciences building BU

 

Atop the podium will sit an additional 13 floors, each one slightly off center from the one below to create the stack of books aesthetic. Floors three through five will house the mathematics and statistics department (the fifth floor will also have a lunch space and meeting rooms). Floors six through 10 will comprise mainly space for the computer science department. The interdisciplinary Hariri Institute will be located on the top six floors, with floors 11 and 12 housing administrative offices.

 

See Also: Denning House completes at Stanford University

 

Interior Data Sciences building

 

The building will include a series of terraced platforms for small group interaction, whiteboard walls, and a collaboration ramp stippled with gathering spaces.

On the team: BRA (MEP), Entuitive + LeMessurier (structural engineer), Richard Burck (landscape architect), and Nitsch Engineering (civil engineer). Construction is expected to begin this spring.

 

BU data sciences building as seen from afar

Related Stories

| Jul 11, 2014

$44.5 million Centennial Hall opens at University of Wisconsin-Eau Claire

Centennial Hall houses the College of Education and Human Sciences and consolidates teacher education. It is the first new academic building on the UW-Eau Claire campus in more than 30 years.

| Jul 10, 2014

Berkeley Lab opens 'world's most comprehensive building efficiency simulator'

  DOE’s new FLEXLAB is a first-of-its-kind simulator that lets users test energy-efficient building systems individually or as an integrated system, under real-world conditions.

| Jul 9, 2014

Harvard Business School to build large-scale conference center

Expected to open in 2018, the facility will combine the elements of a large-scale conference center, a performance space, and an intimate community forum. The new building will be designed by Boston-based William Rawn and Associates.

| Jul 7, 2014

7 emerging design trends in brick buildings

From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick. 

Sponsored | | Jul 7, 2014

Channel glass illuminates science at the University of San Francisco

The University of San Francisco’s new John Lo Schiavo Center for Science and Innovation brings science to the forefront of academic life. Its glossy, three-story exterior invites students into the facility, and then flows sleekly down into the hillside where below-grade laboratories and classrooms make efficient use of space on the landlocked campus. 

| Jul 2, 2014

Emerging trends in commercial flooring

Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.

| Jun 30, 2014

Research finds continued growth of design-build throughout United States

New research findings indicate that for the first time more than half of projects above $10 million are being completed through design-build project delivery. 

| Jun 18, 2014

Arup uses 3D printing to fabricate one-of-a-kind structural steel components

The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.

| Jun 16, 2014

6 U.S. cities at the forefront of innovation districts

A new Brookings Institution study records the emergence of “competitive places that are also cool spaces.”

| Jun 12, 2014

Tod Williams Billie Tsien Architects' design selected for new UCSC facility

The planned site is a natural landscape among redwood trees with views over Monterey Bay, a site that the architects have called “one of the most beautiful they have ever worked on.”

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021