flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The 15-minute city may not work in much of North America

Codes and Standards

The 15-minute city may not work in much of North America

Segregated neighborhoods and car-centric cities may not adapt to the European model.


By Peter Fabris, Contributing Editor | March 23, 2021

Courtesy Pixabay

The “15-minute city” where residents live within a short walk or bike ride of all their daily needs has gained favor during the COVID-19 pandemic, with some cities banning or reducing cars in designated areas.

This model, the norm in central areas of European cities that were largely settled before the advent of the automobile, faces difficulty in translation to North America. Cities on this side of the Atlantic were laid out with vehicular traffic in mind, creating widely settled areas with fewer tight-knit neighborhoods.

What’s more, economically disadvantaged areas of cities often lack amenities such as grocery stores, pharmacies, and other necessities. Without a concerted effort and significant investment, these urban areas cannot be easily transformed into the 15-minute city model.

Adding bike lanes and small parks will not reverse segregation that had been embedded into city planning for decades. While the 15-minute city may not be realistic for some North American cities, if these communities can transform from a 45-minute city to a 20-minute city, that would be a worthwhile achievement, some planners say.

Related Stories

| Sep 14, 2012

NRCA University offers photovoltaic class

NRCA University will offer a class called “Photovoltaic Roof Systems: Energizing Your Business” Oct. 16 in Philadelphia.

| Sep 14, 2012

Costa Rica’s strict building codes prevent major damage in powerful quake

The relatively little damage from a 7.6 earthquake was due in large part to strict building codes in Costa Rica, a country that has long enjoyed more stability, better governance, and stronger economic development than many of its Central American neighbors.

| Sep 14, 2012

Building codes should require continuous connection from roof to foundation, says IBHS chief

“One of the most effective ways to greatly increase a building’s strength and safety during hurricanes, tornadoes and straight-line windstorms is to be sure the building is tied together properly,” says Julie Rochman, president and CEO of the Insurance Institute for Business & Home Safety (IBHS).

| Sep 7, 2012

Related Companies and unions agree to wage-cutting deal on Hudson Yards

The Related Companies has won wage-cutting agreements with four dozen construction unions in its efforts to save money on the $15 billion development of Hudson Yards.

| Sep 7, 2012

Lorain, Ohio considers halting downtown construction while it works out development plan

Construction would stop downtown for six months while Lorain, Ohio officials consider a development plan for the city, according to new legislation.

| Sep 7, 2012

Business, labor groups push for easing of California’s Environmental Quality Act

Business and labor groups have combined forces to push for a change to California's Environmental Quality Act, specifically its complex review process for building and construction projects.

| Sep 7, 2012

Twenty years later, Florida contractors cite Hurricane Andrew as construction game-changer

Remarking on the 20th anniversary of Hurricane Andrew, which devastated south Florida; contractors are noting the storm’s impact on their industry—including the state’s adoption of tougher building codes.

| Sep 7, 2012

At risk for nine types of natural disasters, Texas trails most coastal states on building codes

Texas has the most diverse weather risk in the country, with exposure to nine different types of natural disasters.

| Aug 30, 2012

OSHA plans new crane-safety standards for demolition and underground work

The new rule will streamline OSHA’s standards by eliminating the separate cranes and derricks standard currently used for underground and demolition work.

| Aug 30, 2012

Federal government cancels defense contracts worth $2.15 billion

This action may foreshadow federal spending cuts scheduled for year's end if Congress takes no action on the federal budget.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021