flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World’s first prefab operating room with fully automated disinfection technology opens in New York

Healthcare Facilities

World’s first prefab operating room with fully automated disinfection technology opens in New York

The operating room is part of the largest orthopedic outpatient facility in the Northeast.


By Peter Fabris, Contributing Editor | July 19, 2023
World’s first prefab operating room with fully automated disinfection technology opens in New York
The facility, developed in a former Sears store, features a system designed by Synergy Med, called Clean Cube, that had never been applied to an operating space before. Rendering: Synergy Med Global Design Solutions

The first prefabricated operating room in the world with fully automated disinfection technology opened recently at the University of Rochester Medicine Orthopedics Surgery Center in Henrietta, N.Y. The facility, developed in a former Sears store, features a system designed by Synergy Med, called Clean Cube, that had never been applied to an operating space before.

The components of the Clean Cube operating room were custom premanufactured and then shipped to the site to be assembled. The system was installed in a few weeks. It is composed of modular glass walls that are easier to clean than drywall or stainless steel, and hermetically sealed doors. All mechanical, electrical, and plumbing systems are incorporated into the walls and ceiling. Air handling systems tailored for medical use and automated disinfection systems create a sterile field of air around the patient during surgery.

Development of the Clean Cube system was motivated by a 1 in 25 rate of hospital-acquired infections. The technology is billed as delivering “near-perfect disinfection” to the operating room.

The opening of the Orthopedic Surgery Center completes phase 2 of the 350,000 sf University of Rochester Orthopedic & Physical Performance Center. The delivery of the next phase, a four-story rehab and sports performance center that will include a grand courtyard and sports rehab services, is on track for completion in fall 2023.

“The University of Rochester Medical Center (URMC) will be a defining healthcare project for the country,” says Scott Hansche, principal with SLAM, architect of record for the project. “From a former Sears department store to a world-leading surgery center, we are addressing healthcare equity gaps with quality design and innovation,” Hansche says.

Project team:
Owner and/or developer: Wilmorite
Design architect: Perkins&Will's New York studio
Architect of record: The S/L/A/M Collaborative
Local Associate Architect: Dwyer Architectural
MEP/IT Engineer : ME Engineering
Structural Engineer: Jensen BRV
General contractor/construction manager: Le Chase
Civil Engineer and Landscape Architect: Bergmann Associates

Related Stories

| Jul 18, 2014

2014 Giants 300 Report

Building Design+Construction magazine's annual ranking the nation's largest architecture, engineering, and construction firms in the U.S.

| Jul 17, 2014

A harmful trade-off many U.S. green buildings make

The Urban Green Council addresses a concern that many "green" buildings in the U.S. have: poor insulation.

| Jul 15, 2014

Michael Graves talks with Washington Post about new design eye from life in a wheelchair

Celebrated American architect Michael Graves sits with the Washington Post to talk about how being on a wheelchair changed the way he focuses on design.

| Jul 13, 2014

Punishing deadline can’t derail this prison health facility [2014 Building Team Awards]

A massive scope, tough schedule, and technical complexity fail to daunt the Building Team for a huge California correctional project.

| Jul 10, 2014

BioSkin 'vertical sprinkler' named top technical innovation in high-rise design

BioSkin, a system of water-filled ceramic pipes that cools the exterior surface of buildings and their surrounding micro-climates, has won the 2014 Tall Building Innovation Award from the Council on Tall Buildings and Urban Habitat.

| Jul 8, 2014

Fast-track naval hospital sparks sea change in project delivery [2014 Building Team Awards]

Through advanced coordination methods and an experimental contract method, the Building Team for Camp Pendleton’s new hospital campus sets a new standard for project delivery.

| Jul 7, 2014

Team unity pays off for a new hospital in Maine [2014 Building Team Awards]

Extensive use of local contractors, vendors, and laborers brings a Maine hospital project in months ahead of schedule.

| Jul 7, 2014

7 emerging design trends in brick buildings

From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick. 

| Jul 7, 2014

A climate-controlled city is Dubai's newest colossal project

To add to Dubai's already impressive portfolio of world's tallest tower and world's largest natural flower garden, Dubai Holding has plans to build the world's largest climate-controlled city.

| Jul 2, 2014

The doctor is in the firehouse: New clinic to be built in California fire station

Designed by WRNS Studio, the Firehouse Clinic will encourage local residents with limited healthcare access to consider them as an alternative to the emergency room, especially for preventive care. 

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021