A single mobile phone uses more energy per unit than a refrigerator, not so much in terms of recharging but in the data traffic and other actions the phone creates.
The Information and Communications Technology (ICT) sector consumes as much as 10% of the world’s electricity, a sizable portion of which goes toward operating data centers that are the spine of the Internet and the cloud.
Large data centers can use more electricity than a midsize town. However, much of that energy ends up being released as heat into the atmosphere, to the point where carbon emissions from data centers could exceed what the entire airline industry spews annually within the next five years.
Consequently, as data centers expand, greater emphasis is being placed on controlling their impact on the environment. Apple claims that all of its data centers are powered by 100% renewable energy, including new data centers in Denmark and Ireland that will be completed in 2017. Apple has also made an $850 million investment in a solar farm in California to power its new campus in Silicon Valley, all its California offices and data centers, and its data center in Newark, Calif.
In Falun, Sweden, the municipality owned Falu Energi & Vatten is collaborating with Schneider Electric and EcoDC AB, which specializes in designing and building climate-smart data centers, to build what this team is calling the world’s first climate-positive data center.
The location of this three-building, 250,000-sf EcoDataCenter is relevant. Falun is one of the greenest towns on the planet. Ninety-five percent of houses with district heat in Falun (about half of all homes in the municipality) are provided with heat from a cogeneration plant that recycles forestry waste to produce electricity and warm water.
The town also has one of Sweden’s largest solar panel arrays. More than half of Falun’s energy needs are provided by hydro, wind, and cogeneration plants, with the rest coming from renewable sources such as solar and secondary biofuels.
Consequently, 100% of the energy that the EcoDataCenter would use will come from renewable sources. The 18-megawatt data center will be connected to Falun’s energy grid, and excess heat from its servers and equipment will warm buildings in the town’s district heating system. During the summer, excess steam from a local electricity plant will run machines that cool the data center.
No electricity will be required to increase the return water temperature from the data center. Heat from the data center replaces existing marginal heat production with high CO2 emissions. This CO2 replacement will exceed total CO2 emissions from the data center during a year.
EcoDataCenter’s first building should be completed in the first quarter of 2016. When fully operational, EcoDataCenter should attain the highest levels of availability and security classification. (It is expected to be Sweden’s first to achieve a Tier IV certification from Uptime Institute.)
The data center is projected to operate with a power usage effectiveness (PUE)—useful IT kilowatts divided by totally used kilowatts—of less than 1.15.
Related Stories
| Sep 24, 2013
8 grand green roofs (and walls)
A dramatic interior green wall at Drexel University and a massive, 4.4-acre vegetated roof at the Kauffman Performing Arts Center in Kansas City are among the projects honored in the 2013 Green Roof and Wall Awards of Excellence.
| Sep 19, 2013
What we can learn from the world’s greenest buildings
Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.
| Sep 19, 2013
6 emerging energy-management glazing technologies
Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level.
| Sep 19, 2013
Roof renovation tips: Making the choice between overlayment and tear-off
When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.
| Sep 11, 2013
BUILDINGChicago eShow Daily – Day 3 coverage
Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Aug 30, 2013
Local Government Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 30, 2013
State Government Report [2013 Giants 300 Report]
Stantec, Jacobs, PCL Construction among nation's top state government design and construction firms, according to BD+C's 2013 Giants 300 Report.
| Aug 28, 2013
Federal Government Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest federal government design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 27, 2013
Industrial Sector Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2013 Giants 300 Report.