flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Wirtz Beverage Illinois’ corporate headquarters completed

Wirtz Beverage Illinois’ corporate headquarters completed

WBI Center, a new state-of-the-art facility, is designed by Ware Malcomb.


By Posted by Tim Gregorski, Senior Editor | December 4, 2012
The 500,000-sf warehouse contains one of the largest temperature-controlled wine
The 500,000-sf warehouse contains one of the largest temperature-controlled wine storage components in the country.

International design firm, Ware Malcomb, announced the completion of Wirtz Beverage Illinois’ project: a new 605,000-sf corporate headquarters located at 3333 South Laramie Avenue, Cicero, Ill.

The new state-of-the-art facility, also known as WBI Center, consolidates four Wirtz Beverage locations into one monumental hub for sales, distribution, and training programs. Ware Malcomb provided architectural design and interior design services to Wirtz Realty Group [the newly formed real estate arm of Wirtz Corporation] for this ambitious and innovative project that integrates offices, conference centers, training facilities with warehouse and distribution areas.

Several unique technological features were incorporated throughout the facility. For example, digital signage screens can be found embedded in hallway floors and lobby areas. The 500,000-sf warehouse contains one of the largest temperature-controlled wine storage components in the country. A leading factor that drove the entire design of the site, the building’s shell, and its utility systems is the high-tech Automated Storage and Retrieval System (ASRS) with high bay robotic picking.

The general contractor for the project was Ryan Companies US, Inc. +

Related Stories

| Sep 22, 2010

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition

Landscape architect Michael Van Valkenburgh and a multidisciplinary team of experts in “urban renewal, preservation, commemoration, social connections and ecological restoration” have been picked for the planning phase of The City+The Arch+The River 2015 International Design Competition.

| Sep 22, 2010

Satellier, Potential + Semac close investment deal

Satellier, a world leader in providing CAD and Building Information Modeling (BIM) outsourced services to the architecture, engineering and construction industry, announces a strategic minority investment from India-based top engineering firm Potential + Semac, ushering in the next evolution of the global architecture support industry.

| Sep 21, 2010

New BOMA-Kingsley Report Shows Compression in Utilities and Total Operating Expenses

A new report from the Building Owners and Managers Association (BOMA) International and Kingsley Associates shows that property professionals are trimming building operating expenses to stay competitive in today’s challenging marketplace. The report, which analyzes data from BOMA International’s 2010 Experience Exchange Report® (EER), revealed a $0.09 (1.1 percent) decrease in total operating expenses for U.S. private-sector buildings during 2009.

| Sep 21, 2010

Forecast: Existing buildings to earn 50% of green building certifications

A new report from Pike Research forecasts that by 2020, nearly half the green building certifications will be for existing buildings—accounting for 25 billion sf. The study, “Green Building Certification Programs,” analyzed current market and regulatory conditions related to green building certification programs, and found that green building remain robust during the recession and that certifications for existing buildings are an increasing area of focus.

| Sep 21, 2010

Middough Inc. Celebrates its 60th Anniversary

Middough Inc., a top ranking U.S. architectural, engineering and management services company, announces the celebration of its 60th anniversary, says President and CEO, Ronald R. Ledin, PE.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021