International design firm, Ware Malcomb, announced the completion of Wirtz Beverage Illinois’ project: a new 605,000-sf corporate headquarters located at 3333 South Laramie Avenue, Cicero, Ill.
The new state-of-the-art facility, also known as WBI Center, consolidates four Wirtz Beverage locations into one monumental hub for sales, distribution, and training programs. Ware Malcomb provided architectural design and interior design services to Wirtz Realty Group [the newly formed real estate arm of Wirtz Corporation] for this ambitious and innovative project that integrates offices, conference centers, training facilities with warehouse and distribution areas.
Several unique technological features were incorporated throughout the facility. For example, digital signage screens can be found embedded in hallway floors and lobby areas. The 500,000-sf warehouse contains one of the largest temperature-controlled wine storage components in the country. A leading factor that drove the entire design of the site, the building’s shell, and its utility systems is the high-tech Automated Storage and Retrieval System (ASRS) with high bay robotic picking.
The general contractor for the project was Ryan Companies US, Inc. +
Related Stories
| Jun 11, 2012
Genivar and WSP Group join forces
Genivar concurrently announces a $225 million public bought deal of subscription receipts, a $197 million private placement of subscription receipts and new credit facilities.
| Jun 11, 2012
SimplexGrinnell highlights integrated suite of web-based technologies at NFPA Expo
eservices platform uses the power of the Internet to deliver more value to customers.
| Jun 11, 2012
Reed Construction announces new hire and promotion
Reed Construction hired Augie Insalaco as a project manager and promoted Matt Mahoney from project intern to project engineer.
| Jun 11, 2012
Hill International selected as CM for Porto Arabia Towers in Qatar
The complex is a mixed-use development featuring both residential and commercial properties.
| Jun 8, 2012
Living Building Challenge wins the 2012 Buckminster Fuller Challenge
The Living Building Challenge was chosen from a pool of 122 of entries from around the world.
| Jun 8, 2012
Nauset Construction completing sustainable dorm for Brooks School
Student input on green elements provides learning experience.
| Jun 8, 2012
Skyline Construction names Millitello president
Millitello is a 31-year veteran who has overseen the construction of campus-size projects.
| Jun 8, 2012
Thornton Tomasetti/Fore Solutions provides consulting for renovation at Tufts School of Dental Medicine
Project receives LEED Gold certification.