flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Wirtz Beverage Illinois’ corporate headquarters completed

Wirtz Beverage Illinois’ corporate headquarters completed

WBI Center, a new state-of-the-art facility, is designed by Ware Malcomb.


By Posted by Tim Gregorski, Senior Editor | December 4, 2012
The 500,000-sf warehouse contains one of the largest temperature-controlled wine
The 500,000-sf warehouse contains one of the largest temperature-controlled wine storage components in the country.

International design firm, Ware Malcomb, announced the completion of Wirtz Beverage Illinois’ project: a new 605,000-sf corporate headquarters located at 3333 South Laramie Avenue, Cicero, Ill.

The new state-of-the-art facility, also known as WBI Center, consolidates four Wirtz Beverage locations into one monumental hub for sales, distribution, and training programs. Ware Malcomb provided architectural design and interior design services to Wirtz Realty Group [the newly formed real estate arm of Wirtz Corporation] for this ambitious and innovative project that integrates offices, conference centers, training facilities with warehouse and distribution areas.

Several unique technological features were incorporated throughout the facility. For example, digital signage screens can be found embedded in hallway floors and lobby areas. The 500,000-sf warehouse contains one of the largest temperature-controlled wine storage components in the country. A leading factor that drove the entire design of the site, the building’s shell, and its utility systems is the high-tech Automated Storage and Retrieval System (ASRS) with high bay robotic picking.

The general contractor for the project was Ryan Companies US, Inc. +

Related Stories

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 9, 2012

NELSON, Torchia announce merger

Former competitors seek competitive advantage by joining forces.

| Jul 9, 2012

Integrated Design Group completes UCSB data center

Firm uses European standard of power at USCB North Hall Research Data Center.

| Jul 9, 2012

Oakdale, Calif., Heritage Oaks Senior Apartments opens

New complex highlights senior preferences for amenities.

| Jul 3, 2012

Trimble to acquire WinEstimator

Acquisition adds estimating software solutions to Meridian Systems’ portfolio.

| Jul 3, 2012

Summit Design+Build completes Emmi Solutions HQ

The new headquarters totals 20,455 sq. ft. and features a loft-style space with exposed masonry and mechanical systems, 17-ft clear ceilings, two large rooftop skylights, and private offices with full glass partition walls.

| Jul 3, 2012

TOLK now called Dewberry

The renaming indicates a simplification in Dewberry’s corporate naming conventions.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

| Jul 2, 2012

Plumosa School of the Arts earns LEED Gold

Education project dedicated to teaching sustainability in the classroom.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021