flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Wiel Arets unveils twin, 558-foot mixed-use towers in Bahrain’s capital

Multifamily Housing

Wiel Arets unveils twin, 558-foot mixed-use towers in Bahrain’s capital

The development, Bahrain Bay Tower, will consist of two residential towers connected “by a plinth of retail, office, parking, and public park space.”


By Adilla Menayang, Assistant Digital Editor | October 1, 2015
Designs unveiled for 558-foot mixed-use towers in Bahrain’s capital

The ground floor is designed to be publicly accessible, composed mostly of retail and public lobby space. Renderings courtesy of Wiel Arets Architects

Global firm Wiel Arets Architects revealed its plans for a 558-foot tower in Manama, Bahrain. According to ArchDaily, the tower will be called Bahrain Bay Tower, and will consist of two residential towers connected “by a plinth of retail, office, parking, and public park space.”

Housing options in the residential sections range from one- to three-bedroom units. Throughout the two towers, glazed and operable windows allow access to light and air in each living space.

"Due to the extensive amounts of glazing on the tower’s façade, a panel-like system of sliding aluminum louvers serves as an additional layer of privacy and shading—in tandem with the façade’s treated glass, and the covered exterior terraces,” the firm explains in a release. “Together, these elements protect the tower’s interior from passive solar gain, while the louvers lend to the tower, an ever changing and thus chameleon-like appearance, due to the reflections they catch from direct sunlight."

The ground floor is designed to be publicly accessible, composed mostly of retail and public lobby space.

About the ground level design, the firm says: "Due to a division of these ground floor spaces, along the site’s southern edge, a breezeway was created that allows the public to traverse the tower’s entire site—without entering its interior—which serves to infuse the tower’s immediate context with pedestrian life. In this way, the ground level frontages of the tower’s retail spaces are maximized."

 

Related Stories

Wood | Oct 19, 2018

Design revealed for mass-timber residential tower in Milwaukee

The developer is confident that the city will approve construction, which is scheduled to start next year.

Multifamily Housing | Oct 10, 2018

Affordable treasures

This year’s prestigious Gold Nugget Awards honor four projects that provide affordably priced housing for homeless families, seniors, and veterans.

Multifamily Housing | Oct 9, 2018

Breaking new ground: The New Home Company

The company, which is headquartered in Aliso Viejo, Calif. relies heavily on focus groups and market research to understand buyer preferences specific to each new community.

Mixed-Use | Oct 4, 2018

Four-story hotel and adjacent affordable housing community opens in California’s Sonoma County

Axis/GFA Architecture and Design was the architect for the project.

Multifamily Housing | Sep 25, 2018

Fitness centers go for wellness

Equipment choice, room size, program offerings—a lot of thinking has to go into creating a fitness facility that pays off in resident satisfaction.

Multifamily Housing | Sep 24, 2018

Topsy-turvy: Creative use of air rights results in a model of urban luxury design

Using bold cantilevering and imaginative structural design, ODA and its project team created a 12-story building whose massing grows in width as it steps upward.

Multifamily Housing | Sep 21, 2018

A place of ‘voluntary and cheerful resort’

A project team soldiers on in the wake of a nightmarish turn of events.

Multifamily Housing | Sep 19, 2018

Multifamily market trends 2018: What the experts are saying

The growth of keyless entry solutions and demand for oversized units are among the trends and ideas shared at Marcus & Millichap’s 2018 Multifamily Forum in Chicago.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021