This week on The Weekly show, BD+C editors spoke with leaders from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot about three themes:
• How to improve wayfinding and signage to meet the needs of a pandemic environment
• Applications for the use of artificial intelligence (AI) in construction scheduling
• Omniverse, Nvidia's new 3D simulation platform
WATCH THE SEGMENTS ON DEMAND BELOW
THE WEEKLY SHOW HIGHLIGHTS FOR NOVEMBER 12, 2020
BD+C's Group Director Tony Mancini runs down the highlights from this week's show.
SEGMENT #1
COVID-19 Signage Design and Wayfinding
BD+C's Robert Cassidy chats with David Bailey, AIA, Principal with Hastings Architecture, Nashville, Tenn., about improved signage and wayfinding for the COVID-19 pandemic. Bailey will show examples of bad signage that has sprung up, and how Hastings Architecture has designed new signs that use graphics and text to provide better information and clearer direction to the public.
SEGMENT #2
AI for Construction Scheduling
BD+C's David Barista speaks with Rene Morkos, PhD, Founder of ALICE Technologies, and Mike MacBean, Director of Preconstruction with San Francisco-based GC Build Group, about applications for the use of artificial intelligence (AI) tools for optimizing the construction scheduling process. Build Group is piloting the ALICE platform on the 5M mega project in San Francisco.
SEGMENT #3
Omniverse: A Collaborative Platform to Simulate Reality
John Caulfield speaks with Richard Kerris, GM of Media and Entertainment for Nvidia, and Robert Cervellione, Design Technology Manager with Woods Bagot, about Omniverse, Nvidia's 3D simulation platform that allows users to collaborate with multiple pieces of software.
WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN
“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.
Related Stories
AEC Tech | Jul 10, 2019
Blue Collar Labs launches Builder’s Almanac, an online construction technology evaluation platform
The free online resource aims to eliminate subjective bias from the contech software evaluation process.
AEC Tech | Jul 2, 2019
Living in a cloud: What nanotech means for architecture and the built environment
Could there come a time when buildings will become less about bricks and mortar and feel more like mists or fogs?
AEC Tech | Jun 28, 2019
In London, Autodesk homes in on construction management
The software goliath sounds the alarm about the urgent need for productivity improvements to address unbridled urbanization.
Giants 400 | Jun 26, 2019
How are the AEC Giants faring in the tech arms race?
About half (42%) say their firm is “on par” with their most-direct AEC competitors.
AEC Tech | Jun 10, 2019
Mortenson joins forces with robotics technology producer
The partners will focus on equipment used for earthmoving in wind and solar projects.
AEC Tech | May 15, 2019
AI and digital twin firm Reconstruct Inc. closing $7.7 million Series A investment
Reconstruct’s AI and digital twin capabilities provide indoor/outdoor views for project stakeholders to track and resolve project issues in a virtual environment before they impact cost and schedule.
AEC Tech | May 7, 2019
Can machines design?
Instead of debating about whether machines can design, why don’t we ask, What if they could? How might architecture change if computers take over the process entirely?
Codes and Standards | Apr 25, 2019
Report: Contractors invest $1.6 billion in workforce development annually
ABC members increased training spending 45% from 2013, according to a new report.
AEC Tech | Apr 24, 2019
PlanGrid Delivers BIM Data in 2D and 3D Directly to Mobile Users in the Field
One of the construction industry’s most widely-used mobile technologies makes critical data accessible in the field with first major Autodesk integration after acquisition.
Digital Twin | Apr 24, 2019
Can Digital Twin make project management more efficient?
One leading owner’s rep is pushing that idea with its “OneModel” BIM-sharing approach.