This week on The Weekly show, BD+C editors spoke with leaders from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot about three themes:
• How to improve wayfinding and signage to meet the needs of a pandemic environment
• Applications for the use of artificial intelligence (AI) in construction scheduling
• Omniverse, Nvidia's new 3D simulation platform
WATCH THE SEGMENTS ON DEMAND BELOW
THE WEEKLY SHOW HIGHLIGHTS FOR NOVEMBER 12, 2020
BD+C's Group Director Tony Mancini runs down the highlights from this week's show.
SEGMENT #1
COVID-19 Signage Design and Wayfinding
BD+C's Robert Cassidy chats with David Bailey, AIA, Principal with Hastings Architecture, Nashville, Tenn., about improved signage and wayfinding for the COVID-19 pandemic. Bailey will show examples of bad signage that has sprung up, and how Hastings Architecture has designed new signs that use graphics and text to provide better information and clearer direction to the public.
SEGMENT #2
AI for Construction Scheduling
BD+C's David Barista speaks with Rene Morkos, PhD, Founder of ALICE Technologies, and Mike MacBean, Director of Preconstruction with San Francisco-based GC Build Group, about applications for the use of artificial intelligence (AI) tools for optimizing the construction scheduling process. Build Group is piloting the ALICE platform on the 5M mega project in San Francisco.
SEGMENT #3
Omniverse: A Collaborative Platform to Simulate Reality
John Caulfield speaks with Richard Kerris, GM of Media and Entertainment for Nvidia, and Robert Cervellione, Design Technology Manager with Woods Bagot, about Omniverse, Nvidia's 3D simulation platform that allows users to collaborate with multiple pieces of software.
WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN
“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.
Related Stories
Digital Twin | Aug 27, 2020
The Weekly show: Digital twin technology and social equity in the AEC market
The August 27 episode of BD+C's "The Weekly" is available for viewing on demand.
AEC Tech | Apr 13, 2020
A robotic dog becomes part of Swinerton’s construction technology arsenal
Boston Dynamics, the robot’s creator, has about 100 machines in the field currently.
AEC Tech | Mar 30, 2020
Will 3D printing be an answer for building more affordable homes?
A project in southern California will put onsite fabrication to the test against other construction modes.
AEC Tech | Mar 23, 2020
Working from home? Don't miss out on the latest issue of Building Design+Construction
BD+C's March issue features the largest and most important technological innovations across the AEC industry.
AEC Tech | Mar 17, 2020
A tree grows in Stanford: CIFE, VDC, and where it all began
As our industry adopts VDC as standard practice, it is important to remember where these ideas began and continue to emanate from today.
AEC Tech | Mar 10, 2020
No labor. No infrastructure. No problem.
OpenSpace’s AI-based reality capture tool looks to make site documentation a completely passive experience.
Healthcare Facilities | Mar 9, 2020
Mobile wayfinding platform helps patients, visitors navigate convoluted health campuses
Gozio Health uses a robot to roam hospital campuses to capture data and create detailed maps of the building spaces and campus.
Green | Mar 9, 2020
BuroHappold commits to all new building projects achieving net-zero carbon by 2030
The engineering firm also launched a long-term partnership with ILFI.
Architects | Mar 2, 2020
Two ‘firsts’ for Sasaki and LEO A DALY
Following an industry trend, the firms hire chiefs of technology and sustainability, respectively.
AEC Tech | Feb 22, 2020
Investor interest in the built environment not quite as avid in 2019
Builtworlds’ annual list of venture deals led by workspace providers.