flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Victory Drive Student Housing project will bring 650 beds to Savannah College of Art and Design

University Buildings

Victory Drive Student Housing project will bring 650 beds to Savannah College of Art and Design

The project will utilize the design-build resources of Clayco and BatesForum.


By David Malone, Associate Editor | May 8, 2019

Savannah College of Art and Design has announced a new student housing project that will be located on 2.5 acres in downtown Savannah, Ga.

The $54 million-Victory Drive Student Housing project will comprise 250,000 sf across two residence halls and a 96,000-sf parking garage with 260 spaces. The two residence halls will total 650 beds and a resident directory apartment. Suites will be offered in four-bed and two-bed options along with one-bedroom studios. The residence halls will also house lounges, study rooms, art studios, laundry rooms, and management offices.

 

See Also: Center for Engineering, Innovation, and Sciences opens on Wentworth Institute of Technology’s Boston campus

 

The West Hall will be four stories of wood frame construction and the East Hall will be five stories of wood frame construction that wraps the precast parking garage on three sides. The exterior of both buildings will consist of brick, curtain wall, metal panels, and stucco.

Construction has recently begun with completion slated for August 2020.

Related Stories

University Buildings | Dec 13, 2020

U. of Oregon’s new Knight Campus is set up to turn ideas into reality

Its design encourages occupant productivity and well-being.

Giants 400 | Dec 3, 2020

2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector

HDR, Jacobs, and Turner head BD+C's rankings of the nation's largest science and technology (S+T) facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Giants 400 | Dec 2, 2020

2020 University Giants: Top architecture, engineering, and construction firms in the higher education sector

Gensler, AECOM, and Turner Construction top BD+C's rankings of the nation's largest university sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

University Buildings | Nov 25, 2020

Stanford bioresearch quad's new public art piece, “Morphogenesis”

Stanford University's Morphogenesis installation connects user interaction with a large-scale media mesh platform.

University Buildings | Nov 20, 2020

Why precast concrete is an appealing choice for student housing

A variety of material solutions are emerging to accelerate construction timelines, and precast concrete has become an attractive option.

Laboratories | Nov 16, 2020

Washington State University’s new Plant Sciences Building opens

LMN Architects designed the project.

AEC Tech | Nov 12, 2020

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.

University Buildings | Nov 5, 2020

BIG selected to design new Student Center for Johns Hopkins University

The new center will become the heart of the university’s campus.

Smart Buildings | Oct 26, 2020

World’s first smart building assessment and rating program released

The SPIRE Smart Building Program will help building owners and operators make better investment decisions, improve tenant satisfaction, and increase asset value.

Building Team Awards | Oct 24, 2020

Emory University Student Center wins the top award in 2020 Building Team Awards

Emory University Student Center wins the top award in 2020 Building Team Awards

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021