flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Vermont’s Burr and Burton Academy expansion will feature mass timber and flexible spaces

Education Facilities

Vermont’s Burr and Burton Academy expansion will feature mass timber and flexible spaces

KaTO and ZGF Architects designed the building.


By David Malone, Associate Editor | June 4, 2020
Burr and Burton Academy library

All images courtesy KaTO and ZGF Architects

A new three-story academic building is being added to the Burr and Burton Academy in Manchester, Vermont. 

The 25,000-sf expansion, designed by KaTO and ZGF Architects, will comprise interdisciplinary classrooms and the school’s library on BBA’s upper campus. The building is organized around a central commons that will house the school’s library, which has been reimagined as a lively environment that encourages activity and interaction. Spaces for individual work and study will also be included.

 

Burr and Burton Academy exploded view

 

The library will be built from CLT and glulam and reflect the surrounding mountainous landscape. Mass timber was selected to help support student health and success as a growing body of research suggests it has psychological health and well-being benefits such as reduced stress and lower blood pressure.

 

Burr and Burton Academy Aerial view

 

The building will be divided into four distinct learning neighborhoods that support different levels of flexibility and types of activity. A STEAM neighborhood will co-locate a student maker shop with specialty equipment, a computer laboratory, and a learning space. These spaces will be connected by operable garage doors that can be opened to form a greater Maker Commons.

Designed to be net-zero ready, the new facility will include electric-run HVAC sysxtems, an air-to-water heat pump, and the timber structure for the building commons. The expansion will welcome its first students in fall 2021.

Related Stories

University Buildings | Mar 27, 2019

Veterans Resource Center at Cypress College breaks ground

Sundt Construction is building the project.

Education Facilities | Mar 8, 2019

Nature preserve on the Yangtze River will restore biodiversity to a polluted area

Ennead Architects, in partnership with Andropogon Landscape Architects, is designing the project.

Education Facilities | Feb 23, 2019

Construction completed on classroom/dorm combo building on Worcester Polytechnic’s campus

The latest addition embodies the school’s emphasis on collaborative problem-solving.

Libraries | Feb 10, 2019

New library branch in San Diego opens with its community’s learning and working traits in mind

It features larger gathering spaces and more technology than its predecessor.

Green | Jan 28, 2019

This is the country’s greenest academic building

Perkins+Will designed the building.

Education Facilities | Jan 22, 2019

Rethinking classroom design to promote collaboration

A dynamic learning space needs to center around the learner, and be flexible enough to transform into any configuration that will facilitate collaboration, especially as curriculums change.

Education Facilities | Jan 21, 2019

N.J. middle school puts its small site to use

The school is named in honor of Martin Luther King, Jr.’s vision of the “Beloved Community.”

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021