flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Vermont’s Burr and Burton Academy expansion will feature mass timber and flexible spaces

Education Facilities

Vermont’s Burr and Burton Academy expansion will feature mass timber and flexible spaces

KaTO and ZGF Architects designed the building.


By David Malone, Associate Editor | June 4, 2020
Burr and Burton Academy library

All images courtesy KaTO and ZGF Architects

A new three-story academic building is being added to the Burr and Burton Academy in Manchester, Vermont. 

The 25,000-sf expansion, designed by KaTO and ZGF Architects, will comprise interdisciplinary classrooms and the school’s library on BBA’s upper campus. The building is organized around a central commons that will house the school’s library, which has been reimagined as a lively environment that encourages activity and interaction. Spaces for individual work and study will also be included.

 

Burr and Burton Academy exploded view

 

The library will be built from CLT and glulam and reflect the surrounding mountainous landscape. Mass timber was selected to help support student health and success as a growing body of research suggests it has psychological health and well-being benefits such as reduced stress and lower blood pressure.

 

Burr and Burton Academy Aerial view

 

The building will be divided into four distinct learning neighborhoods that support different levels of flexibility and types of activity. A STEAM neighborhood will co-locate a student maker shop with specialty equipment, a computer laboratory, and a learning space. These spaces will be connected by operable garage doors that can be opened to form a greater Maker Commons.

Designed to be net-zero ready, the new facility will include electric-run HVAC sysxtems, an air-to-water heat pump, and the timber structure for the building commons. The expansion will welcome its first students in fall 2021.

Related Stories

Education Facilities | May 17, 2021

Henning Larsen breaks ground on sustainable primary school in Denmark

The project will be the country’s first Ecolabel primary school.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

Education Facilities | Apr 6, 2021

Saugus Middle/High School completes

HMFH Architects designed the project.

Education Facilities | Mar 3, 2021

Higher Ed facilities management is at a crossroads

A new report states the pandemic brought to the fore the need to reassess space and investment in existing buildings.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Education Facilities | Feb 22, 2021

The learning commons and academic success

A vibrant, modern Learning Commons can draw students in and make learning fun.

Education Facilities | Feb 10, 2021

Atlanta’s David T. Howard School completes redesign and rehabilitation project

The original school’s alumni includes Dr. Martin Luther King, Jr. and Walt Frazier.

Education Facilities | Jan 28, 2021

Gallatin High School completes in Bozeman, Mont.

Cushing Terrell designed the project.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021