Creating an energy-use model and cost profile early in a project design process—using lightweight tools and resources, such as energy use intensity data and DOE commercial benchmark model data—can provide direction to the Building Team and generate consensus around an energy-efficient design that saves time and money.
This course explores how to increase project value through energy modeling, as well as how to conduct quick payback and net present value studies to identify which energy strategies are most viable for the project.
After reading this article, you should be able to:
• Explain the basic concept of energy modeling as a process that allows project stakeholders to understand the predicted energy use/energy cost of a building before it is actually built.
• Discuss three attributes of a successful project energy strategy, including pushing the owner’s and project team’s aspirations while demonstrating successful payback over time.
• Describe how to create a project’s energy-use profile using a variety of available options.
• List the key factors to be considered in setting up an effective request for proposals for an energy-modeling bid.
TAKE THIS AIA/CES DISCOVERY COURSE AT BDCUNIVERSITY.COM
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.