Creating an energy-use model and cost profile early in a project design process—using lightweight tools and resources, such as energy use intensity data and DOE commercial benchmark model data—can provide direction to the Building Team and generate consensus around an energy-efficient design that saves time and money.
This course explores how to increase project value through energy modeling, as well as how to conduct quick payback and net present value studies to identify which energy strategies are most viable for the project.
After reading this article, you should be able to:
• Explain the basic concept of energy modeling as a process that allows project stakeholders to understand the predicted energy use/energy cost of a building before it is actually built.
• Discuss three attributes of a successful project energy strategy, including pushing the owner’s and project team’s aspirations while demonstrating successful payback over time.
• Describe how to create a project’s energy-use profile using a variety of available options.
• List the key factors to be considered in setting up an effective request for proposals for an energy-modeling bid.
TAKE THIS AIA/CES DISCOVERY COURSE AT BDCUNIVERSITY.COM
Related Stories
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.