flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

As the U.S. economy sputters back to life, contractors wait for the green light on projects [2013 Giants 300 Report]

As the U.S. economy sputters back to life, contractors wait for the green light on projects [2013 Giants 300 Report]

There are enough positive indictors in the economy to justify greenlighting projects, but building owners and developers remain reluctant to pull the trigger. 


By David Barista, Editor-in-Chief | July 16, 2013
Completed in March 2012, the sleek office and prototype facility for global defe
Completed in March 2012, the sleek office and prototype facility for global defense contractor BAE Systems consolidates the companys operations in Sterling Heights, Mich. Walbridge was general contractor on the project, which involved building a 55,000-sf prototype center with 20 bays for vehicle and subsystem testing, and a 164,000-sf office structure to accommodate 600 employees. SmithGroupJJR was the AE firm on the project, providing architectural, structural, mechanical, and electrical services. PHOTO: COURTESY WALBRIDGE AND SMITHGROUPJJR
The narrative of the U.S. nonresidential construction industry of the last 12 months has been one of growth, but in all the wrong places. While five of the 16 major construction sectors grew last year—some significantly—those that experienced the largest gains represent a relatively small portion of the overall market. On the flip side, several sectors that saw the steepest decline last year happen to make up a fairly sizable portion of nonresidential construction.
 
Lodging, for example, has been on a tear in recent months, growing 16.6% between April 2012 and April 2013 in order to meet the increase in business and leisure travel. Double-digit YOY growth is good news any way you look at it, but the fact that lodging represents just 2% of the overall market means it will do little to move the needle. Same goes for the transportation (11.4% growth), commercial (1.9%), and office (1.6%) sectors: their growth is muted by their relatively small size.
 
On the other hand, major sectors like education, power, and highway and street all saw a drop in construction spending last year.
 
“As a result, when you look at the aggregate, we’re not seeing much of a recovery in nonresidential construction spending,” said Anirban Basu, Chief Economist with the Associated Builders and Contractors (ABC) and Chairman and CEO with Sage Policy Group, during his recent mid-year construction forecast. 

TOP CONTRACTORS

 
2012 Total Revenue ($)
1 Turner Corporation, The $9,084,870,000
2 Fluor $4,268,290,500
3 Skanska USA $4,076,092,814
4 PCL Construction Enterprises $3,981,419,164
5 Whiting-Turner Contracting Co., The $3,699,782,771
6 Clark Group $3,563,246,719
7 Balfour Beatty $3,453,790,847
8 Gilbane $3,083,529,000
9 Structure Tone $2,947,433,000
10 McCarthy Holdings $2,546,000,000
 

TOP CONSTRUCTION MANAGEMENT FIRMS

 
2012 Total Revenue ($)
1 URS Corp. $297,282,076
2 STV $227,390,000
3 JE Dunn Construction $207,304,154
4 Barton Malow $182,697,897
5 Parsons Brinckerhoff $179,900,000
6 S. M. Wilson & Co. $168,859,740
7 Turner Corporation, The $157,920,000
8 Jones Lang LaSalle $140,020,000
9 LPCiminelli $139,198,329
10 Structure Tone $132,000,000
“What we’re seeing is a real dichotomy in the market. There is evidence of private-sector improvement in the data, but we also see strong evidence of constrained public-sector budgets affecting major markets like education and public safety,” he says.  
 
Basu predicted a 5-6% bump in total nonresidential construction spending in 2013, with the bulk of the gains coming from the commercial and industrial sectors. “It’s not terrible news, but given how far nonresidential activity had fallen, this is a really slow rebound at best,” he added.
 
Adding to the frustration of AEC firms, said Basu, is the reluctance of many building owners and developers to pull the trigger on new construction and renovation projects. He said there are enough positive indictors in the U.S. economy to justify greenlighting projects: 2% GDP growth this year, even with the sequestration measures taking hold; falling unemployment numbers; positive consumer spending and household wealth figures; an upturn in housing construction; near-historic-low interest rates; shrinking office and industrial vacancy rates; healthy hotel occupancy rates; and budget surpluses in some states.
 
“All of this suggests we should be in the midst of a fairly robust nonresidential construction recovery, but it’s simply not taking place,” said Basu, offering some possible explanations: uncertainty related to the Affordable Care Act; an investor community that remains largely skittish; slow population growth; troubled state and local government budgets; public pension concerns; high unemployment rates; European Union budget woes; and the overall rise in healthcare costs.
 
This mixed bag of positive and negative economic data translates into a gradual recovery for the nonresidential construction market.
 

Read BD+C's full Giants 300 Report

Related Stories

| Jul 8, 2014

Frank Lloyd Wright's posthumous gas station opens in Buffalo

Eighty-seven years after Frank Lloyd Wright designed an ornamental gas station for the city of Buffalo, the structure has been built and opened to the public—inside an auto museum. 

| Jul 8, 2014

Lost in the Museum: Bjarke Ingels' maze will make you look up and around

The maze, located in the National Building Museum, is a precursor to an exhibit showcasing some of BIG's projects. To navigate the maze, people must look up.

| Jul 7, 2014

5 factors that can affect thermal stress break risk of insulated glass units

The glass type, glass coating, shading patterns, vents, and framing system can impact an IGU’s risk for a thermal break.

| Jul 7, 2014

Team unity pays off for a new hospital in Maine [2014 Building Team Awards]

Extensive use of local contractors, vendors, and laborers brings a Maine hospital project in months ahead of schedule.

| Jul 7, 2014

7 emerging design trends in brick buildings

From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick. 

| Jul 7, 2014

A climate-controlled city is Dubai's newest colossal project

To add to Dubai's already impressive portfolio of world's tallest tower and world's largest natural flower garden, Dubai Holding has plans to build the world's largest climate-controlled city.

Sponsored | | Jul 7, 2014

Channel glass illuminates science at the University of San Francisco

The University of San Francisco’s new John Lo Schiavo Center for Science and Innovation brings science to the forefront of academic life. Its glossy, three-story exterior invites students into the facility, and then flows sleekly down into the hillside where below-grade laboratories and classrooms make efficient use of space on the landlocked campus. 

| Jul 7, 2014

How to keep an employee from jumping ship

The secret to keeping your best employees productive and happy isn’t throwing money at them, as studies have continuously shown that money isn’t the top factor in employee happiness. Here are four strategies from leadership coach Kristi Hedges. SPONSORED CONTENT

| Jul 7, 2014

Nothing fixes a bad manager

Companies seem to try everything imaginable to fix their workplaces, says Gallup Chairman and CEO Jim Clifton in a recent blog post, except the only thing that matters: naming the right person manager. SPONSORED CONTENT

| Jul 3, 2014

Gehry edits Canadian skyscraper plan to be 'more Toronto'

After being criticized for the original tower complex, architect Frank Gehry unveils a new design that is more subtle, and "more Toronto."

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021