Upgrade brings comfort and efficiency to Euclid Chemical

Sponsored Content Energy Efficiency

Upgrade brings comfort and efficiency to Euclid Chemical

Euclid Chemical upgrades to a dependable and efficient system that will meet their needs for years to come.


By LG | December 20, 2016

Euclid Chemical, based in Cleveland, has been supplying the construction industry with products to improve the strength, appearance, and usability of concrete since 1910. Now a large, multi-national corporation, Euclid Chemical’s main offices are in a two-story, 15,000 square foot building that also contains laboratories where they develop products ranging from sealants to micro synthetic fibers. 

Until recently, the building relied upon an aging VAV system with terminal reheat to keep their offices comfortable and to maintain environmental conditions in the laboratories.  Even when new, records showed the system had not performed as designed. This inadequate performance was compounded by cumulative effects of years of normal wear and tear along with questionable modifications. 

Ultimately, the system no longer kept people comfortable, broke down frequently and was incredibly inefficient.  After analyzing the utility bills, Joe Messer, Director of Engineering for Euclid Chemical, realized that building had an average annual energy use of 38 kWh/square foot -- over twice the average consumption for offices in the same geographic area, and more than most of Euclid’s manufacturing facilities. Messer knew Euclid Chemical needed to upgrade to a dependable and efficient system that would meet their needs for years to come.

CRITERIA:

The building housed both office areas and laboratories, so throughout the facility the system had to provide individual temperature control which, at any given time, may require both heating and cooling in different areas.

In the lab, the system also had to account for the unique challenge of quickly adapting to rapidly changing make-up air requirements as laboratory fume hoods started and stopped.  It also had to work in the Ohio climate where the outdoor temperature ranged from sub-zero weather in the winter to humid high-90’s in the summer.  But above all else, the system had to have a manageable upfront cost and an attractive payback to the Euclid financial team. 

SOLUTION: 

Messer began the process of finding a new solution and reached out to trusted engineer Andy Culberson of Geisel Heating and Cooling.  Culberson identified VRF (Variable Refrigerant Flow) technology as the optimum solution, and reached out to Peter Eno of Refrigeration Sales Corporation to collaborate on a best-in-class solution based on VRF technology from LG Electronics.  Together they designed a system around LG Multi-V heat recovery systems. 

The bulky 50 ton DX unit on the roof was replaced by a pair of small air-cooled outdoor units on the ground, and the VAV boxes inside the building were replaced with LG’s concealed high-static VRF indoor units. To account for the need for ventilation air and makeup air when the laboratory fume hoods were in use, a small makeup air unit with a water heating coil was added to provide ventilation air at a high-static pressure to the LG VRF indoor units. Since this was 100 percent outdoor air, the airflow could be adjusted to precisely meet the ventilation requirements as they changed.  The LG Multi V is a heat recovery system, so it can heat the zones that need it while cooling others simultaneously which delivers precise temperature in all parts of the facility regardless of Ohio’s weather, including subzero winters.  

After they presented the system proposal, everyone at Euclid Chemical was sold on the concept. Based on the problems and poor performance of the existing system, Messer conservatively estimated the new system would cut their utility bills by 40 percent. What’s more, they could reuse the existing distribution and supply ductwork, reducing upfront installation costs, which further sold the financial team.     

RESULTS:

Once construction was completed, the system performance exceeded expectations, according to Messer.  After implementation, the facility saw a 70 percent annual energy reduction compared to the average of the previous five years. (See graph.)  

Equally important, the new system provides a quiet, comfortable environment for people to work.  “Employees have definitely noticed an improvement in comfort,” said Messer.  “This allowed us to focus on our core business instead of worrying about HVAC.”  He is currently evaluating other buildings within the Euclid portfolio and, not surprisingly, he’s considering LG VRF solutions

Related Stories

Brick and Masonry | Feb 5, 2015

3D-printed 'cool brick' may provide cooling solution for arid locations

Cool Brick is made of porous ceramic bricks set in mortar. The bricks absorb water, which cools the air as it passes through the unit.

Green | Feb 4, 2015

Illinois leads top 10 states for LEED green building

Collectively, 1,662 commercial and institutional projects became LEED certified within the top 10 states in 2014, representing 251.7 million sf of real estate. 

Sponsored | Metals | Jan 30, 2015

Want greater energy savings? The answer is right above you

A recent study finds that metal roofs can cut energy costs.

Energy Efficiency | Jan 28, 2015

An urban wind and solar energy system that may actually work

The system was designed to take advantage of a building's air flow and generate energy even if its in the middle of a city.

| Jan 21, 2015

Tesla Motors starts construction on $5 billion battery plant in Nevada

Tesla Motors’ “gigafactory,” a $5 billion project on 980 acres in Sparks, Nev., could annually produce enough power for 500,000 electric cars.

| Jan 14, 2015

Winners of the 2014 Architecture at Zero competition announced

The competition challenged design teams to create zero-net-energy buildings for the Jack London Gateway project site in Oakland, Calif. 

| Jan 7, 2015

Department of Energy seeks public input on definition for zero-energy buildings

A broadly accepted market definition of zero-energy buildings is foundational to efforts by governments, utilities, or private entities to recognize or incentivize zero energy buildings. 

Smart Buildings | Jan 7, 2015

NIBS report: Small commercial buildings offer huge energy efficiency retrofit opportunities

The report identifies several barriers to investment in such retrofits, such as the costs and complexity associated with relatively small loan sizes, and issues many small-building owners have in understanding and trusting predicted retrofit outcomes.

| Dec 28, 2014

Using energy modeling to increase project value [AIA course]

This course, worth 1.0 AIA LU/HSW, explores how to increase project value through energy modeling, as well as how to conduct quick payback and net present value studies to identify which energy strategies are most viable for the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021