flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

High-rise Construction

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

The 1,186-foot tower will be the third-tallest building in the city.


By Mike Chamernik, Associate Editor | May 2, 2016
Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

Vista Tower. Renderings courtesy Studio Gang.

Construction will soon begin on Studio Gang’s 93-story Vista Tower in Chicago. 

Crain’s Chicago reports that the city made the official announcement Monday that ground will be broken this summer. 

At 1,186 feet, the supertall tower will be the third-tallest in the city, behind the Willis Tower (1,450 feet) and Trump International Hotel & Tower (1,389 feet). It will be just higher than the 1,136-foot Aon Center and the 1,127-foot John Hancock Center. Vista Tower is comprised of three interconnected volumes at 47, 71, and 93 stories.

Magellan Development and Dalian Wanda Group are leading the building process. The $1 billion development will include 200 hotel rooms and 400 condos. Located along the Chicago River, Vista Tower will connect to the Riverwalk, a public plaza along the water.

“At ground level, the building creates an essential pedestrian connection between the Riverwalk and the community park’s outdoor recreational facilities,” said the project description on Studio Gang’s website. “Retail, restaurant, and hotel amenities combine at the upper levels, creating a vibrant public social center—a microcosm of a city united.”

Gang’s tower is just one of several new projects for the city. Designers Rafael Viñoly and Helmut Jahn have also designed supertall structures for Chicago.

 

Click image to enlarge.

Click image to enlarge.

Click image to enlarge.

 

Update*

Vista Tower is half completed

The 101-story Vista Tower, which will become Chicago’s third tallest once completed, is now 50% complete. Concrete has been poured to the 50th floor with a year and a half until the slated move-in date.

The towers glass façade will reflect the blue-green hue of the neighboring Chicago River and Lake Michigan. Meanwhile, the interiors will give residents the option of choosing between four gem tone finishes: fluorite, amethyst, topaz, and sapphire.

The building’s units are currently more than 40% sold.

 

 

Related Stories

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Oct 20, 2011

Johnson Controls appoints Wojciechowski to lead real estate and facilities management business for Global Technology sector

Wojciechowski will be responsible for leading the continued growth of the technology vertical market, while building on the expertise the company has developed serving multinational technology companies. 

| Oct 18, 2011

Michel Bruneau wins 2012 AISC T.R. Higgins Award

The AISC T.R. Higgins Lectureship Award is presented annually by the American Institute of Steel Construction (AISC) and recognizes an outstanding lecturer and author whose technical paper(s) are considered an outstanding contribution to the engineering literature on fabricated structural steel. 

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Oct 5, 2011

GREENBUILD 2011: Johnson Controls announces Panoptix, a new approach to building efficiency

Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market.

| Oct 5, 2011

GREENBUILD 2011: Sustainable construction should stress durability as well as energy efficiency

There is now a call for making enhanced resilience of a building’s structure to natural and man-made disasters the first consideration of a green building. 

| Oct 4, 2011

GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.

| Sep 20, 2011

Jeanne Gang wins MacArthur Fellowship

Jeanne Gang, a 2011 MacArthur Fellowship winner described by the foundation as "an architect challenging the aesthetic and technical possibilities of the art form in a wide range of structures."

| Sep 14, 2011

Lend Lease’s role in 9/11 Memorial & Museum

Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Center site in New York City.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021