flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

High-rise Construction

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

The 1,186-foot tower will be the third-tallest building in the city.


By Mike Chamernik, Associate Editor | May 2, 2016
Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

Vista Tower. Renderings courtesy Studio Gang.

Construction will soon begin on Studio Gang’s 93-story Vista Tower in Chicago. 

Crain’s Chicago reports that the city made the official announcement Monday that ground will be broken this summer. 

At 1,186 feet, the supertall tower will be the third-tallest in the city, behind the Willis Tower (1,450 feet) and Trump International Hotel & Tower (1,389 feet). It will be just higher than the 1,136-foot Aon Center and the 1,127-foot John Hancock Center. Vista Tower is comprised of three interconnected volumes at 47, 71, and 93 stories.

Magellan Development and Dalian Wanda Group are leading the building process. The $1 billion development will include 200 hotel rooms and 400 condos. Located along the Chicago River, Vista Tower will connect to the Riverwalk, a public plaza along the water.

“At ground level, the building creates an essential pedestrian connection between the Riverwalk and the community park’s outdoor recreational facilities,” said the project description on Studio Gang’s website. “Retail, restaurant, and hotel amenities combine at the upper levels, creating a vibrant public social center—a microcosm of a city united.”

Gang’s tower is just one of several new projects for the city. Designers Rafael Viñoly and Helmut Jahn have also designed supertall structures for Chicago.

 

Click image to enlarge.

Click image to enlarge.

Click image to enlarge.

 

Update*

Vista Tower is half completed

The 101-story Vista Tower, which will become Chicago’s third tallest once completed, is now 50% complete. Concrete has been poured to the 50th floor with a year and a half until the slated move-in date.

The towers glass façade will reflect the blue-green hue of the neighboring Chicago River and Lake Michigan. Meanwhile, the interiors will give residents the option of choosing between four gem tone finishes: fluorite, amethyst, topaz, and sapphire.

The building’s units are currently more than 40% sold.

 

 

Related Stories

| Jun 13, 2012

Thornton Tomasetti founding principals receive CTBUH Fazlur R. Khan Lifetime Achievement Medal

This is the first time the CTBUH Board of Trustees has awarded the prize to two individuals jointly.

| Jun 6, 2012

KPF designs tower for Yongsan IBD

The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 15, 2012

One World Trade Center goes to new height of sustainability

One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021