flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

University of Washington Tacoma breaks ground on new STEM learning lab

University Buildings

University of Washington Tacoma breaks ground on new STEM learning lab

ARO designed the project.


By David Malone, Managing Editor | July 21, 2021
Milgard Hall exterior rendering
Milgard Hall exterior rendering

The University of Washington Tacoma (UWT) has broken ground on Milgard Hall, a state-of-the-art STEM learning lab. The building will connect students and faculty across the Milgard Business School, the School of Engineering & Technology, and the Global Innovation and Design Lab.

Designed by Architecture Research Office (ARO), the 55,000-sf building will be built with mass timber and incorporates sustainability into almost every facet of the facility’s design and construction. The building is carefully sited to maximize access to daylight and views and is programmed relative to solar energy to reduce HVAC loads wherever possible.

Milgard Hall is located adjacent to the revitalized Prairie Line Trail and surrounded by historic warehouse structures. The design is rooted in Tacoma’s history, including its connection to lumber and trades and the terminus of the Northern Pacific Railroad. Exterior materials relate to the existing brick structures nearby as well as the modern urban context. Glimpses of the mass timber structure can be seen through expanses of glass in select zones. The local brick is contrasted with profiled metal panels. Large windows punctuate the facade, opening up towards the sky.

 

SEE ALSO: New 678-bed student housing development breaks ground near the University of South Carolina

 

Classrooms, laboratories, and an outdoor Science Court are situated to be visible from the Prairie Line Trail, actively connecting the students to passersby. An open, airy, common area, dubbed the “Connector,” extends through the building and accommodates a natural path across campus, further activating the building as a student hub at the south side of campus. All departments converge in the Connector, allowing it to be used simultaneously as a collaborative zone and for individual study and work. The Connector also welcomes the surrounding community, providing access to a large, flexible High Impact Practice Space and other flexible classrooms.

The building will be a home for the expanding School of Engineering and Technology (SET) and will house a lab wing providing new engineering spaces on campus. The spaces will include a machine and fabrication shop and concrete combustion labs with exterior access to the street and Science Court. Hydrology and Robotics labs are located on the upper floors of the building. The Global Innovation Design Lab (GIDLab) will include flexible spaces that support a design thinking methodology. Synergies between SET, GIDLab, and the Milgard School of Business will be promoted in the building, intersecting with the broader Tacoma community.

Milgard Hall is slated to be completed in 2023.

Related Stories

University Buildings | Apr 2, 2019

Denning House completes at Stanford University

Ennead Architects designed the building.

University Buildings | Mar 27, 2019

Veterans Resource Center at Cypress College breaks ground

Sundt Construction is building the project.

Mixed-Use | Feb 21, 2019

An R&D-oriented innovation district is taking shape in the heart of Durham, N.C.

Its buildout has included converting old tobacco warehouses into offices and labs.

University Buildings | Jan 29, 2019

The Colorado School of Mines CoorsTek Center opens

Bohlin Cywinski Jackson designed the building.

University Buildings | Dec 17, 2018

SCUP and University of Pennsylvania School of Nursing release study results on lactation policy and facilities in U.S. higher education

There is a wide variability between how campuses accommodate the needs of breastfeeding mothers.

University Buildings | Dec 10, 2018

Suffolk breaks ground on large housing/dining complex for UMass Dartmouth

This is the first phase of a large construction/renovation plan for the school’s main campus.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021