flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

University of Miami design/build program receives new immersive-learning facility

University Buildings

University of Miami design/build program receives new immersive-learning facility

Professor Rocco Ceo designed the studio space.


By David Malone, Associate Editor | February 1, 2019
UM BuildLab at night

All photos: Herman Schumacher Photography

The University of Miami Department of Architecture recently unveiled the B.E. & W.R. Miller BuildLab. The space was created by and for the Department of Architecture and provides a space for students to execute a modern architectural project from start to finish in a real-life design/build context.

The open-air building has a 40-foot x 40-foot concrete frame and 17.5-foot-high ceilings. Professor Rocco Ceo, AIA, LEED AP, NCARB, designed the building and then students completed the furnishings and interior and exterior details of the project.

 

See Also: The Colorado School of Mines CoorsTek Center opens

 

Building materials and tools are held in a series of containers around the building’s perimeter to keep the main space open and useable for physical work. Kebony modified wood panels with inset doors make up the structure’s walls and encourage air circulation throughout the space. A double-height roll-up door with a built in ramp is located on one side of the building and is dimensioned to the Florida Department of Transportation’s specifications to accommodate loading projects on a flatbed truck for transportation to the site for assembly.

 

UM BuildLab

 

UM BuildLab

 

Interior of UM BuildLab

 

Work in UM BuildLab

 

Students working in UM BuildLab

Related Stories

University Buildings | Mar 4, 2022

The University of Wisconsin-Milwaukee celebrates new chemistry building with groundbreaking

The building will serve as a gateway for all STEM and health science related majors, housing the Department of Chemistry and Biochemistry.  

Higher Education | Mar 1, 2022

SRG Partnership designs a nautically inspired space for maritime science

A community college in Oregon has begun construction on a new building devoted to maritime science. With it, the school hopes to solidify its position as a major industrial and marine technology center in the Pacific Northwest.

Education Facilities | Feb 24, 2022

New ASU science and tech building features innovative sustainability elements

Arizona State University’s Interdisciplinary Science and Technology Building 7, completed in December 2021, was constructed with numerous innovative sustainability elements.

University Buildings | Feb 18, 2022

On-campus performing arts centers and museums can be talent magnets for universities

Cultural facilities are changing the way prospective students and parents view higher education campuses.

University Buildings | Feb 18, 2022

UPenn converts a library past its prime to a tech-integrated learning and maker

In September 2021, Penn reopened its renovated and expanded library as an open center for cross-disciplinary learning, prototyping, and collaboration. Now called Biotech Commons, the 17,000-sf building supports new modes of research by offering a range of spaces and services that is free to be scheduled by any student or faculty member.

University Buildings | Feb 17, 2022

A vacated school in St. Louis is turned into a center where suppliers exchange ideas

In 1871, The Carondelet School, designed by Frederick William Raeder, opened to educate more than 400 children of laborers and manufacturers in St. Louis. The building is getting a second lease on life, as it has undergone a $2 million renovation by goBRANDgo!, a marketing firm for the manufacturing and industrial sectors.

University Buildings | Feb 15, 2022

Ohio University's Chilled Water Plant #3 brings high design to a campus utility

Leers Weinzapfel Associates has also designed chiller plants on the campuses of Princeton University, the University of Pennsylvania, Tufts University, the University of Massachusetts Amherst, Harvard University’s Allston Campus, and the Ohio State University.  

Coronavirus | Jan 20, 2022

Advances and challenges in improving indoor air quality in commercial buildings

Michael Dreidger, CEO of IAQ tech startup Airsset speaks with BD+C's John Caulfield about how building owners and property managers can improve their buildings' air quality.

University Buildings | Jan 19, 2022

Eastern Michigan University launches major student housing project

The institution is working with Gilbane Development Company to build or renovate more than 2,700 on-campus beds.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021