flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UC Riverside’s new School of Medicine building supports team-based learning, showcases passive design strategies

University Buildings

UC Riverside’s new School of Medicine building supports team-based learning, showcases passive design strategies

The five-floor, 94,500-sf Education Building II offers social and group learning spaces and provides departmental offices for faculty and staff.


By Novid Parsi, Contributing Editor  | June 18, 2024
UC Riverside’s new School of Medicine building supports team-based learning, showcases passive design strategies
Photo: Bill Timmerman Photography

The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Created by the design-build team of CO Architects and Hensel Phelps, the medical school’s new home supports team-based student learning, offers social spaces, and provides departmental offices for faculty and staff. 

The learning spaces are located on the first three floors, while the administration and shared functions are housed on the top two floors. The building features interactive classrooms, 15 case-based group seminar rooms, variously sized study rooms, and additional study and amenity spaces.

The building includes materials, such as cast-in-place concrete, brick, terracotta, and glass, that are meant to be both beautiful and durable, lasting for generations.

Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography

EDII’s design emphasizes transparency to help demystify medical education and welcome prospective students from diverse backgrounds. The use of transparency and shading leverages passive light, prevailing breezes, and solar heat gain. A rooftop solar array contributes to the building’s energy efficiency. 

Each façade is optimized for the climate and for varying levels of sun exposure throughout the day. On the east façade, vertical glass fiber reinforced concrete (GFRC) fins create extended shadows and protect the interior from the harsh morning light. Painted perforated aluminum panels shade the east and west exit stairs as well as the south façade’s windows. The porous north façade features abundant glass and walls opening to the courtyard.

Located in a drought-prone region, the building restores the site’s natural vegetative conditions. The ground-level plaza connects the surrounding buildings. 

Inside, a three-story perforated gypsum mural depicts an abstraction of orange groves, referencing the region’s history. 

On the Building Team:
Owner: UCR School of Medicine
Architect/interior designer: CO Architects
Contractor: Hensel Phelps
Landscape architect: Spurlock Landscape Architects 
MEP engineer: P2S, Inc. 
Structural engineer, waterproofing, LEED consultant: Thornton Tomasetti 
Civil engineer: Albert A. Webb Associates 
Geotechnical engineer: Langan 
Fire protection engineer: Woden Fire 
Acoustics consultant: Arpeggio 

The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography

Here is the project essay from the design-build team of Hensel Phelps and CO Architects:

The School of Medicine (SOM) Education Building II (EDII) fulfills the mission of the University of California, Riverside (UCR), to train a diverse workforce of physicians to support the medically underserved Riverside County region of Southern California. The building by the design-build partnership of Hensel Phelps + CO Architects creates a new home for the medical school by incorporating a wide range of team-based student learning, social spaces, and departmental offices for faculty and staff into one 95,476-square-foot, five-story structure. Strategically located and highly visible on campus, the EDII amplifies the SOM’s identity as a forward-thinking medical school and showcases the mission and dedication of medical education to undergraduates and community members alike.

The design team and client shared the vision of crafting a building that supports its occupants and creates an environment to empower students throughout their academic experience and into their careers. The architecture utilizes transparency to demystify medical education, welcoming prospective students from diverse backgrounds to learn about the requirements and daily activities of medical students. EDII’s design is meant to be both beautiful and durable, utilizing materials—such as cast-in-place concrete, brick, terracotta, and glass—that fit within the campus context and will last for generations.

Each façade is optimized for the climate and levels of sun exposure throughout the day. Vertical glass fiber reinforced concrete (GFRC) fins on the east façade cast dramatic extended shadows while protecting interior spaces from the harsh morning light. Painted perforated aluminum panels—featuring custom patterns that resonate with the scale and pattern of the building’s brickwork—shade the east and west exit stairs, screening the stairs behind and creating a larger architectural feature on the façades. 

The same panels are used on the south façade to shade individual windows. The staggered window placement is interspersed with brick infill stacked vertically in rows to signify the use of the brick as a façade skin, rather than as load-bearing elements. The north entrance face of the building is porous, both visually with abundant glass and structurally with walls opening out to the courtyard. Inside, a three-story perforated gypsum mural represents an abstraction of orange groves as a nod to the region’s history as the Orange Empire. 

The materials palette provides flexibility for expansion over time and allowed construction details to be easily executed and built. During constructability review, the team modeled the different exterior connections and material intersections to digitally ensure the details were constructible and would stand the test of time with limited or no maintenance. Utilizing the design-build delivery method, the EDII was able to fit within a strict budget and a demanding schedule.

The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography

The EDII was designed with long-term sustainability in mind to ensure it will remain fully functional for generations to come while minimizing its carbon footprint. Located in a drought-prone region, the building defends and restores the natural vegetative conditions of the site. The EDII’s use of transparency and shading optimizes passive elements of light, prevailing breezes, and solar heat gain. The interiors and exteriors utilize durable, easy-to-maintain, and sustainable building materials, as well as low/no-VOC materials that promote healthy interior air quality and performance. A 200-kilowatt solar array on the roof contributes to its energy efficiency. The EDII will achieve LEED Platinum through its multiplicity of sustainability strategies in all building systems.

To maximize EDII’s lifespan, the design is flexible and adaptable to respond to growth as needs and pedagogy change. The building is organized with all the high-activity and student-centric learning spaces on the first three floors, which are more accessible and feature indoor/outdoor spaces, while administration and shared functions are located on the upper two floors. The EDII collocates most of the medical school’s staff, administrators, and faculty in the same building for the first time, creating greater efficiencies and moments for collaboration. 

The medical school’s academic programs are supported by interactive classrooms, 15 case-based group seminar rooms, ample and various sized study rooms, and additional study and amenity spaces that work cohesively to integrate and support student engagement throughout the day and into the night. Throughout the building, the design team identified opportunities to enhance the program with high-profile spaces, such as an interactive tiered classroom that is universally accessible and features an abundance of daylight, state-of-the-art technology, writeup spaces, and informal lounge seating for breakout sessions.

Each level of the EDII capitalizes on the mild Southern California climate by providing outdoor environments that offer views and opportunities for collaboration, socialization, and reflection. An expansive plaza on the ground level connects and organizes the surrounding buildings, creating a new SOM Plaza for a wide variety of School of Medicine and campus events. EDII reinvigorates the area of campus in which it’s sited, creating opportunity for expansion to the south by developing a “Medical Walk”—a pathway that traverses from the health sciences library, across EDI (SOM’s first building), and through EDII, establishing an armature for future expansion. 

Located on a constrained site, EDII uses the challenging terrain in innovative ways to create connections both externally to the campus and internally for users. Each grade level provides accessible opportunities to enter the building, maximizing the topographical nature of the site. By embracing the site’s challenges, EDII establishes meaningful and varied campus interfaces along all sides of the building. The design enriches the campus experience and encourages engagement with the larger campus and community of Riverside.

The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Courtesy CO Architects
Courtesy CO Architects
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography
The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Photo: Bill Timmerman Photography
Photo: Bill Timmerman Photography

 

Courtesy CO Architects
Courtesy CO Architects

 

Related Stories

University Buildings | Feb 23, 2015

Future-proofing educational institutions: 5 trends to consider

In response to rapidly changing conditions in K-12 and higher education, institutions and school districts should consider these five trends to ensure a productive, educated future.

University Buildings | Feb 20, 2015

Penn strengthens campus security by reviving its surrounding neighborhood

In 1996, the University of Pennsylvania’s sprawling campus in Philadelphia was in the grip of an unprecedented crime wave. But instead of walling themselves off from their surrounding neighborhoods, the school decided to support the community.

University Buildings | Feb 18, 2015

Preparing for the worst: Campus security since Virginia Tech

Seven years after the mass shootings at Virginia Tech, colleges and universities continue to shake up their emergency communications and response capabilities to shootings and other criminal threats.

University Buildings | Feb 17, 2015

BD+C exclusive: How security is influencing campus design and construction

Campus crime—whether real or perceived—presents Building Teams with more opportunities for early-stage consultation with university clients. 

Architects | Feb 11, 2015

Shortlist for 2015 Mies van der Rohe Award announced

Copenhagen, Berlin, and Rotterdam are the cities where most of the shortlisted works have been built. 

| Jan 7, 2015

University of Chicago releases proposed sites for Obama library bid

There are two proposed sites for the plan, both owned by the Chicago Park District in Chicago’s South Side, near the university’s campus in Hyde Park, according to the Chicago Sun-Times.

| Jan 2, 2015

Construction put in place enjoyed healthy gains in 2014

Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.

BIM and Information Technology | Dec 28, 2014

The Big Data revolution: How data-driven design is transforming project planning

There are literally hundreds of applications for deep analytics in planning and design projects, not to mention the many benefits for construction teams, building owners, and facility managers. We profile some early successful applications.  

| Dec 28, 2014

AIA course: Enhancing interior comfort while improving overall building efficacy

Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021