flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Two stations for San Francisco Airport’s people mover system showcase sustainable building practices

Transportation & Parking Facilities

Two stations for San Francisco Airport’s people mover system showcase sustainable building practices

The construction project, completed in the Spring, was awarded LEED Gold last month.


By John Caulfield, Senior Editor | October 6, 2021
San Francisco airport's AirTrain people mover now connects to a long-term parking garage. Images courtesy of Skanska
San Francisco airport's AirTrain system now connects to one of its long-term parking garages. Images courtesy of Skanska

In May, the San Francisco International Airport completed the extension of its AirTrain people mover system to its Long-Term Parking area. At that point, the AirTrain provided connectivity between all terminals, parking garages, an on-airport hotel, the city’s subway system, and the airport’s car rental center. Previously transportation between the long-term parking lot and the terminals had been provided by shuttle buses, and AirTrain’s extension is projected to eliminate 600,000 miles of trips annually, according to the airport.

This $259 million project, which launched in August 2016, extends the AirTrain guideways by 1,900 ft to reach the long-term parking lot. The project included the construction of two new AirTrain stations, each of which built under a $172 million progressive design-build contract with Skanska USA and WSP. The first station, located at the on-site Grand Hyatt hotel, opened to the public on October 2, 2019; the second station, with a pedestrian bridge that connects AirTrain to one of two Long-Term Parking multilevel garages, opened on May 5 of this year.

VERY GREEN STOPS

The construction project’s highlights include the installation of a 2,700-panel PV array on the roof of the long-term parking garage that will generate about two-fifths of the stations’ annual power needs. Water-efficient fittings and fixtures will cut the stations’ water use by 40%. Three-quarters of this project’s construction and demolition debris were recycled. The stations’ indoor air quality complies with LEED air quality assessment standards (prior to occupancy).

In total, more the 50 sustainable practices were implemented as part of the construction of the stations, which were certified LEED Gold in September. “Achieving LEED Gold certifications demonstrates our commitment to employing sustainable practices on every project we undertake,” said Tony Taddeo, Senior Vice President of Operations for Skanska USA Civil.

The interior of one of two new AirTrain stations at San Francisco airport.
AirTrain now extends to one of the airport's parking garages and the Grand Hyatt hotel.
 

PGH Wong was its construction manager on the AirTrain extension project.

AirTrain, which has been in operation since 2003, currently consists of 41 electric vehicles that run along six miles of fully automated concrete guideways.

Related Stories

Transit Facilities | Mar 30, 2017

Train station architectural design fundamentals: Accessibility

If safety is the number one priority for train stations, then accessibility comes in at a close second.

Transportation & Parking Facilities | Jan 31, 2017

Public transportation of the future: Four new sustainable technologies

In 2014, Americans spent an average of 42 hours per year sitting in traffic jams.

Transit Facilities | Jul 13, 2016

Arup chosen to lead renovations of Chicago’s Union Station

The third-busiest station in the country needs more space.  

Resort Design | Jul 11, 2016

Broadway Malyan designs Miami terminal for Royal Caribbean Cruises

The $100 million “Crown of Miami” will provide visitors panoramic views, and it will glow at night.  

Transportation & Parking Facilities | Jun 16, 2016

Dero’s modular Bike Depot offers efficient storage

The units accommodate short-term and long-term storage at transit stations, university campuses, and residential buildings.

Sponsored | Transit Facilities | Jun 13, 2016

HRT Transit Center: The Ambience of a Park in an Efficient Bus Terminal

Whether building architecture or catching a bus, everyone’s happy when things run right on schedule.

Transportation & Parking Facilities | Jun 3, 2016

Colorful parking garage will serve commuters in Bay Area city

Artwork and patterns will be displayed on the structure’s 600-foot wide façade.  

Transportation & Parking Facilities | May 27, 2016

Automated West Hollywood parking garage makes the world a bit cleaner

Using robots to store and fetch parked cars will save on carbon dioxide emissions.  

Building Team Awards | May 24, 2016

Los Angeles bus depot squeezes the most from a tight site

The Building Team for the MTA Division 13 Bus Operations and Maintenance Facility fit 12 acres’ worth of programming in a multi-level structure on a 4.8-acre site.

Transportation & Parking Facilities | Mar 4, 2016

Calatrava's World Trade Center Transportation Hub is now open

Designed to look like a dove being released from a child's hands, the Oculus structure, the hub's focal point, is a symbol of rebirth for Lower Manhattan.

boombox1 - default
boombox2 -
native1 -

More In Category

Giants 400

Top 45 Parking Structure Engineering Firms for 2023

Walker Consultants, Kimley-Horn, Wiss, Janney, Elstner Associates, KPFF Consulting Engineers, and Walter P Moore head BD+C's ranking of the nation's largest parking structure engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report.  


Giants 400

Top 55 Parking Structure Construction Firms for 2023

PCL Construction Enterprises, Swinerton, Bomel Construction, McCarthy Holdings, and Alberici-Flintco top BD+C's ranking of the nation's largest parking structure general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report.


Giants 400

Top 60 Parking Structure Architecture Firms for 2023

Choate Parking Consultants, Page Southerland Page, Gensler, AO, and Elkus Manfredi Architects top BD+C's ranking of the nation's largest parking structure architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021