Two new residential towers will soon grace the Nashville skyline. Alcove at 900 Church, a 34-story, 356-unit building, and Prime at 801 Church, a 38-story, 350-unit building, will be built concurrently on nearly an acre of land in downtown Nashville directly across from the mixed-use development Nashville Yards.
Alcove at 900 Church will include a glass facade and feature a stacked cube aesthetic. It will rise 416 feet. Prime at 801 Church has a smaller footprint than Alcove but retains the stacked glass cube style. Alcove will not feature any parking while Prime will include a 511-space parking garage. Prime will also include two retail spaces totaling approximately 2,600-sf. Spread across the two towers will be balconies, terraces, and a glass-bottomed cantilevered swimming pool.
Both towers will feature elevator systems from Mitsubishi Electric US. Elevators will be equipped with the Mitsubishi Electric Sigma AI 2200C Destination Oriented Allocation System and Mitsubishi Electric’s touch-free elevator call system smartphone app. The system allows residents to call an elevator wirelessly prior to arriving at the elevator lobby, eliminating the need to directly interact with the elevator fixtures.
Both Alcove and Prime are being designed by Goettsch Partners and built by AECOM Hunt. Giarratana LLC is the developer. The towers are scheduled for completion in late 2023.
Related Stories
Multifamily Housing | Nov 7, 2019
Multifamily construction market remains strong heading into 2020
Fewer than one in 10 AEC firms doing multifamily work reported a decrease in proposal activity in Q3 2019, according to a PSMJ report.
| Nov 6, 2019
Solomon Cordwell Buenz opens Seattle office, headed by Nolan Sit
National design firm brings residential high-rise expertise to the Pacific Northwest
| Nov 6, 2019
Passive House senior high-rise uses structural thermal breaks to insulate steel penetrations
Built to International Passive House standards, the Corona Senior Residence in Queens, N.Y., prevents thermal bridging between interior and exterior steel structures by insulating canopies and rooftop supports where they penetrate the building envelope.
Multifamily Housing | Nov 5, 2019
The Collective Paper Factory is the co-living company’s first U.S. location
The building offers a stay model ranging from one night to 29 days.
Multifamily Housing | Nov 4, 2019
A historic ice cream factory now provides Milwaukee with affordable housing
Thanks to projects like this, the Lindsay Heights neighborhood is definitely on the upswing.
Multifamily Housing | Oct 31, 2019
Soltra at SanTan Village breaks ground in Arizona
Todd & Associates designed the project.
| Oct 30, 2019
James McHugh Construction breaks ground on 1000M, Michigan Avenue’s tallest tower to be
McHugh will start work on the 832-foot-tall residential 1000M tower in December 2019.
| Oct 30, 2019
The Beach Company acquires land for multifamily community in Chattanooga
River Rock project will add 163 apartments near the Tennessee River in Chattanooga’s downtown riverfront district.
Multifamily Housing | Oct 30, 2019
Techno-magnet: Multifamily development attracts top tech workers, students
Proto Kendall Square is wooing grad students and millennial STEM workers from what’s arguably ‘the most innovative square mile on the planet.’
Multifamily Housing | Oct 25, 2019
Chicago’s long-gestating luxury condo tower nears construction
Helmut Jahn designed the project.