Two new residential towers will soon grace the Nashville skyline. Alcove at 900 Church, a 34-story, 356-unit building, and Prime at 801 Church, a 38-story, 350-unit building, will be built concurrently on nearly an acre of land in downtown Nashville directly across from the mixed-use development Nashville Yards.
Alcove at 900 Church will include a glass facade and feature a stacked cube aesthetic. It will rise 416 feet. Prime at 801 Church has a smaller footprint than Alcove but retains the stacked glass cube style. Alcove will not feature any parking while Prime will include a 511-space parking garage. Prime will also include two retail spaces totaling approximately 2,600-sf. Spread across the two towers will be balconies, terraces, and a glass-bottomed cantilevered swimming pool.
Both towers will feature elevator systems from Mitsubishi Electric US. Elevators will be equipped with the Mitsubishi Electric Sigma AI 2200C Destination Oriented Allocation System and Mitsubishi Electric’s touch-free elevator call system smartphone app. The system allows residents to call an elevator wirelessly prior to arriving at the elevator lobby, eliminating the need to directly interact with the elevator fixtures.
Both Alcove and Prime are being designed by Goettsch Partners and built by AECOM Hunt. Giarratana LLC is the developer. The towers are scheduled for completion in late 2023.
Related Stories
Multifamily Housing | Apr 20, 2020
Multifamily market flattens as construction proposal activity sinks
Multifamily has consistently been one of the strongest performers among 58 submarkets measured in PSMJ Resources’ quarterly survey.
Coronavirus | Apr 15, 2020
COVID-19 alert: 93% of renters in professionally managed multifamily housing paid some or all of their rent, says NMHC
In its second survey of 11.5 million units of professionally managed apartment units across the country, the National Multifamily Housing Council (NMHC) found that 84% of apartment households made a full or partial rent payment by April 12, up 15 percentage points from April 5.
Multifamily Housing | Apr 15, 2020
Related Group picks Stantec to design and engineer Manor Miramar residences in Florida
Related Group picks Stantec to design and engineer Manor Miramar residences in Florida.
Coronavirus | Apr 5, 2020
COVID-19: Most multifamily contractors experiencing delays in projects due to coronavirus pandemic
The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction.
Plumbing | Mar 13, 2020
Pioneer Industries launches new website
Pioneer Industries launches new website
Multifamily Housing | Mar 5, 2020
The Aviator apartment community opens near Henderson Executive Airport
The community is inspired by antique airplane designs.
Building Materials | Mar 3, 2020
84 Lumber President Maggie Hardy Knox receives Career Achievement Award
Maggie Hardy Knox, President of 84 Lumber and Nemacolin Woodlands Resort, to receive Career Achievement Award.
Multifamily Housing | Feb 26, 2020
School districts in California are stepping in to provide affordable housing for faculty and staff
One high school district in Daly City has broken ground on 122-apartment building.