Frank Lloyd Wright’s Home and Studio and the Frederick C. Robie House are set to reopen for tours in accordance with Phase 3 of Governor Pritzker’s “Restore Illinois” plan. Both sites will reopen on Thursday, June 11.
As part of the reopening, increased cleaning and sanitation practices are being observed in all of the spaces with frequent touch surfaces being disinfected regularly during the day. Public restrooms will be cleaned several times each day and hand sanitizer stations will be located within each site.
Additionally, the tour groups will be limited to eight people per tour and tour routes have been adjusted to help maintain physical distancing. Outdoor tour options have been increased, as well. Shop check out areas are marked with waiting lines spaced six feet apart and plexiglass shields have been installed at register stations. The number of people allowed inside the shops at one time will also be limited
Ticket and shop purchases are credit card (with guests scanning their own cards) only to avoid touch points associated with cash transactions. Finally, all staff, volunteers, and guests must wear face masks at all times.
Related Stories
| Nov 22, 2011
Suffolk Construction selected as contractor for Boston luxury residential tower
Project team breaks ground on 488,000-sf building that will feature world-class amenities.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.
| Nov 21, 2011
Mortenson and enXco partnership to build its 19th wind project
The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.
| Nov 21, 2011
FDH Engineering acquires Energy Solutions
All ESI employees have been merged into FDH’s staff at its St. Louis office.
| Nov 18, 2011
Centre for Interactive Research on Sustainability opens
Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.
| Nov 17, 2011
SmithGroup changes name to SmithGroupJJR
SmithGroup and JJR join brands to become a single, multi-disciplinary company.
| Nov 17, 2011
Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings
Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.
| Nov 17, 2011
Hollister Construction Services renovating bank in Union City, N.J.
Project is part of a series of ground-up construction and renovation assignments.
| Nov 16, 2011
Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.
This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.