Frank Lloyd Wright’s Home and Studio and the Frederick C. Robie House are set to reopen for tours in accordance with Phase 3 of Governor Pritzker’s “Restore Illinois” plan. Both sites will reopen on Thursday, June 11.
As part of the reopening, increased cleaning and sanitation practices are being observed in all of the spaces with frequent touch surfaces being disinfected regularly during the day. Public restrooms will be cleaned several times each day and hand sanitizer stations will be located within each site.
Additionally, the tour groups will be limited to eight people per tour and tour routes have been adjusted to help maintain physical distancing. Outdoor tour options have been increased, as well. Shop check out areas are marked with waiting lines spaced six feet apart and plexiglass shields have been installed at register stations. The number of people allowed inside the shops at one time will also be limited
Ticket and shop purchases are credit card (with guests scanning their own cards) only to avoid touch points associated with cash transactions. Finally, all staff, volunteers, and guests must wear face masks at all times.
Related Stories
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.
| Nov 28, 2011
Armstrong acquires Simplex Ceilings
Simplex will become part of the Armstrong Building Products division.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 23, 2011
Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas
Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 22, 2011
Corporate America adopting revolutionary technology
The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector.
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Nov 22, 2011
New Green Matters Conference examines emerging issues in concrete and sustainability
High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.