TOP 60 K-12 SCHOOL ENGINEERING FIRMS | ||
Rank | Firm | 2015 Revenue |
1 | AECOM | $50,000,000 |
2 | Jacobs | $47,790,000 |
3 | STV | $10,618,628 |
4 | KJWW / TTG | $9,576,078 |
5 | Wendel | $6,321,646 |
6 | Loring Consulting Engineers | $6,000,000 |
7 | SSOE Group | $5,830,000 |
8 | Dewberry | $5,245,499 |
9 | KCI Technologies | $5,000,000 |
10 | M/E Engineering | $4,688,355 |
11 | Interface Engineering | $4,648,596 |
12 | Shive-Hattery | $4,444,746 |
13 | Walter P Moore | $4,383,887 |
14 | Wiss, Janney, Elstner Associates | $3,820,000 |
15 | Coffman Engineers | $3,477,402 |
16 | Bridgers & Paxton Consulting Engineers | $3,463,318 |
17 | Global Engineering Solutions | $3,275,000 |
18 | Simpson Gumpertz & Heger | $2,655,000 |
19 | Henderson Engineers | $2,609,752 |
20 | Bala Consulting Engineers | $2,585,000 |
21 | H.F. Lenz Company | $1,939,675 |
22 | Glumac | $1,864,154 |
23 | KCL Engineering | $1,799,671 |
24 | Heapy Engineering | $1,625,957 |
25 | Peter Basso Associates | $1,584,834 |
26 | RMF Engineering | $1,466,500 |
27 | Thornton Tomasetti | $1,398,507 |
28 | Highland Associates | $1,300,000 |
29 | JQ Engineering | $1,251,500 |
30 | Fishbeck, Thompson, Carr & Huber | $1,200,000 |
31 | Vanderweil Engineers | $1,087,600 |
32 | CJL Engineering, Inc. | $1,080,744 |
33 | I. C. Thomasson Associates | $1,057,400 |
34 | RDK Engineers | $1,016,785 |
35 | Rist-Frost-Shumway Engineering | $1,000,000 |
36 | Karpinski Engineering | $1,000,000 |
37 | TLC Engineering for Architecture | $960,783 |
38 | P2S Engineering | $891,407 |
39 | Graef | $845,962 |
40 | Baird, Hampton & Brown | $824,059 |
41 | OLA Consulting Engineers | $800,034 |
42 | William Tao & Associates | $756,935 |
43 | JBA Consulting Engineers | $650,667 |
44 | KLH Engineers | $604,408 |
45 | KZF Design | $592,946 |
46 | Primera Engineers | $547,143 |
47 | dbHMS | $537,600 |
48 | Wallace Engineering | $500,000 |
49 | ME Engineers | $500,000 |
50 | Newcomb & Boyd | $427,804 |
51 | Davis, Bowen & Friedel | $414,817 |
52 | Architectural Engineers | $394,865 |
53 | G & W Engineering Corp. | $350,090 |
54 | Cardno Haynes Whaley | $323,309 |
55 | Spectrum Engineers | $141,327 |
56 | CTLGroup | $100,000 |
57 | Dunham Associates | $100,000 |
58 | GHT Limited | $100,000 |
59 | Apogee Consulting Group | $70,000 |
60 | Zak Companies | $50,807 |
61 | Ghafari Associates | $50,000 |
62 | Magnusson Klemencic Associates | $20,143 |
63 | Sherlock, Smith & Adams | $7,000 |
64 | Luckett & Farley | $3,703 |
RETURN TO THE GIANTS 300 LANDING PAGE
Related Stories
| Apr 24, 2014
Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum
LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.
| Apr 23, 2014
Ahead of the crowd: How architects can utilize crowdsourcing for project planning
Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.
| Apr 23, 2014
Developers change gears at Atlantic Yards after high-rise modular proves difficult
At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.
| Apr 23, 2014
Experimental bot transfers CAD plans onto construction sites
The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.
| Apr 23, 2014
Mean and Green: Top 10 green building projects for 2014 [slideshow]
The American Institute of Architects' Committee on the Environment has selected the top ten examples of sustainable architecture and ecological design projects that protect and enhance the environment. Projects range from a project for Portland's homeless to public parks to a LEED Platinum campus center.
| Apr 23, 2014
Architecture Billings Index dips in March
The March ABI score was 48.8, down sharply from a mark of 50.7 in February. This score reflects a decrease in design services.
Sponsored | | Apr 23, 2014
Ridgewood High satisfies privacy, daylight and code requirements with fire rated glass
For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Norridge, Ill., the design team specified SuperLite II-XL 60 in GPX Framing for its optical clarity, storefront-like appearance, and high STC ratings.
| Apr 21, 2014
10 design-build best practices
Design-build requires more than a good contract and appropriate risk allocation, says the DBIA. Everyone from the owner to the subcontractors must understand the process, the expectations, and fully engage in the collaboration.
| Apr 18, 2014
Multi-level design elevates Bulgarian Children's Museum [slideshow]
Embodying the theme “little mountains,” the 35,000-sf museum will be located in a former college laboratory building in the Studenski-grad university precinct.
| Apr 17, 2014
Online mapping tool helps teams determine multifamily project tax credit eligibility
Accounting and advisory firm Baker Tilly has launched a new, interactive online mapping tool that helps users determine if a business or development project may qualify for the New Markets Tax Credit or Low-Income Housing Tax Credit program.