flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 30 Sports Facility Engineering Firms

Top 30 Sports Facility Engineering Firms

AECOM, Thornton Tomasetti, and ME Engineers top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 15, 2016

Baxter Arena, University of Nebraska, Omaha, Neb. Image courtesy of HDR Architecture, Inc.

TOP 30 SPORTS FACILITY ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $30,000,000
2 Thornton Tomasetti $21,316,147
3 ME Engineers $18,950,000
4 Walter P Moore $18,678,163
5 WSP | Parsons Brinckerhoff $18,245,000
6 Henderson Engineers $18,179,333
7 Smith Seckman Reid $7,981,930
8 Jacobs $6,930,000
9 Magnusson Klemencic Associates $4,134,707
10 KJWW / TTG $3,320,000
11 Wiss, Janney, Elstner Associates $2,930,000
12 Environmental Systems Design $2,619,733
13 Peter Basso Associates $2,136,605
14 Dewberry $2,112,240
15 Arup $2,062,091
16 Rist-Frost-Shumway Engineering $1,900,000
17 Simpson Gumpertz & Heger $1,796,000
18 Graef $1,716,269
19 TLC Engineering for Architecture $1,489,956
20 Jensen Hughes $1,222,576
21 Interface Engineering $1,031,658
22 KZF Design $1,018,479
23 Shive-Hattery $1,015,197
24 RMF Engineering $838,000
25 Baird, Hampton & Brown $756,502
26 STV $701,926
27 Davis, Bowen & Friedel $476,707
28 Bala Consulting Engineers $400,000
29 Luckett & Farley $380,197
30 Vanderweil Engineers $309,400
31 ThermalTech Engineering $300,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Apr 24, 2014

Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum

LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.

| Apr 23, 2014

Ahead of the crowd: How architects can utilize crowdsourcing for project planning

Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.

| Apr 23, 2014

Developers change gears at Atlantic Yards after high-rise modular proves difficult

At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.

| Apr 23, 2014

Experimental bot transfers CAD plans onto construction sites

The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.

| Apr 23, 2014

Mean and Green: Top 10 green building projects for 2014 [slideshow]

The American Institute of Architects' Committee on the Environment has selected the top ten examples of sustainable architecture and ecological design projects that protect and enhance the environment. Projects range from a project for Portland's homeless to public parks to a LEED Platinum campus center.

| Apr 23, 2014

Architecture Billings Index dips in March

The March ABI score was 48.8, down sharply from a mark of 50.7 in February. This score reflects a decrease in design services.

Sponsored | | Apr 23, 2014

Ridgewood High satisfies privacy, daylight and code requirements with fire rated glass

For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Norridge, Ill., the design team specified SuperLite II-XL 60 in GPX Framing for its optical clarity, storefront-like appearance, and high STC ratings.

| Apr 21, 2014

10 design-build best practices

Design-build requires more than a good contract and appropriate risk allocation, says the DBIA. Everyone from the owner to the subcontractors must understand the process, the expectations, and fully engage in the collaboration. 

| Apr 18, 2014

Multi-level design elevates Bulgarian Children's Museum [slideshow]

Embodying the theme “little mountains,” the 35,000-sf museum will be located in a former college laboratory building in the Studenski-grad university precinct. 

| Apr 17, 2014

Online mapping tool helps teams determine multifamily project tax credit eligibility

Accounting and advisory firm Baker Tilly has launched a new, interactive online mapping tool that helps users determine if a business or development project may qualify for the New Markets Tax Credit or Low-Income Housing Tax Credit program.

boombox1
boombox2
native1

More In Category


Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021